Site work and paving for a road / highway in Portage Lake, Maine. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The lowest responsive bidder must have completed, or successfully complete, a Highway Construction or Paving Prequalification, or project specific prequalification to be considered for the award of this contract. Description: WIN 24977.00 Location: In Aroostook County, project 1s located: Map ID 1 is in T14 R6 WELS and Portage Lake on Route 11 beginning 0.82 miles north of the intersection with the West Road and extending northerly to the Soucy Hill reconstruction project. Includes paving shoulders and trucklanes. Map ID 2 is in Van Buren on the Castonguay Road and Champlain Street beginning on the Castonguay Road at the intersection with Route 1 and extending northwesterly and northeasterly to the intersection with Route 1. Includes paving shoulders and milling and paving Bridge #5306. Map ID 3 is in Westmanland and New Sweden on the Westmanland Road, the Station Road and the Capitol Hill Road beginning on the Westmanland Road at the intersection with the Blackstone Road and extending easterly to the intersection with Route 161; then continuing easterly on the Station Road to the intersection with the Capitol Hill Road; then continuing southerly on the Capitol Hill Road to the intersection of Route 161. Map ID 4 is in Winterville Pit and Eagle Lake on Route 11 beginning at the intersection with the Quimby Road and extending northerly to 0.05 miles south of the intersection with Sunset Drive. Includes paving shoulders and milling and paving Bridge #2597. Map ID 5 is in New Sweden and Connor Twp on the Station Road beginning at the intersection with the Capitol Hill Road and extending easterly to the intersection with Route 1. Map ID 6 is in Washburn, Woodland, and Caribou on Route 164 beginning 0.03 miles south of the Washburn/Woodland town line and extending northeasterly to the Compact Urban Line 0.15 miles southwest of the intersection with Meadowbrook Drive. Includes paving shoulders and milling and paving Bridge #2034. Map ID 7 is in Grand Isle on Route 1 beginning at the intersection with the Cyr Road and extending northwesterly to Bridge #2781. Includes paving shoulders. Map ID 8 is in Ashland and Nashville Pit on Route 11 beginning at the intersection with the Lagoon Road and extending northerly to 0.55 south of the Portage Lake/Nashville line. Includes paving shoulders and milling and paving Bridge #3555. Map ID 9 is in Perham, Woodland, and Washburn on the Carson Road beginning at the intersection with Route 228 and extending easterly to the intersection with Route 164. Outline of Work: Light Capital Paving and other incidental work. Total length is 44.06 miles For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all questions to Tim Pelotte at (207) 624- 3431, use electronic RFI form or email questions to RFI-Contracts MDOT@maine.gov, project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday prior to bid date will not be answered. Bidders shall not contact any other Departmental staff for clarification of Contract provisions, and the Department will not be responsible for any interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon blank forms provided by the Department and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order in the amount of 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable State Laws. The right is hereby reserved to the Maine DOT to reject any or all bids. MEDOT - Light Capital Paving - Fort Kent - Region 5 A penalty in the amount of $500/day will be assessed for each calendar day or partial calendar day beyond June 15 th that the schedule of work is not received.

Award

Roads / Highways

$3,303,235.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
42
All Active Projects
17
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2022

July 18, 2022

img_map_placeholder

Multiple Locations, Portage Lake, ME


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.