Demolition, site work, renovation and addition to a conference / convention center in Fort Worth, Texas. Completed plans call for the addition of a conference / convention center; for the demolition of a conference / convention center; for the renovation of a conference / convention center; and for site work for a conference / convention center.
As of September 6, 2023, construction is underway. The expected time of completion for Phase 1 is early 2026. Included in Phase 1 alone is: State-of-the-art food and beverage facility Demolition of 1983 annex Additional loading docks, bringing the total to 11 from its current 7 Realigning Commerce Street to create a site pad for a future hotel *The original solicitation is listed below for historical reference. The last day for questions from prospective Offerors is at 5:00 PM on Thursday, April 21st, 2022. A final Addendum will be posted Tuesday, April 26th, 2022. The City will select the CMAR Contractor by using a two-step Request for Proposal (RFP) process. After evaluating the submitted Proposals from the CMAR Offerors, the City will shortlist no later than May 13th, and interview the week of June 14th & 15th. The City will then select and enter negotiations with the Best Value Offeror. The City may discuss with the selected Offeror, options for a scope or time modification and any price change associated with such modification. The selected CMAR Contractor will provide Pre-Construction Services including Constructability Reviews, Value Engineering Recommendations and Estimating Services during the various phases of the design process. Prior to the construction documents being completed, the selected CMAR will need to provide an iGMP. Then once the Construction Documents are complete the selected CMAR will provide a final Guaranteed Maximum Price (GMP). The IGMP and GMP will be inclusive of Value Engineering and Estimating Services fees, General Conditions, Construction Manager's Fee, contingency, bonds, insurance, and other agreed upon costs; plus the City's "Owner Contingency". The total construction cost is anticipated to be approximately $35,000,000.00, refer to the "Project Proposal Form" found in the Instructions to Construction Manager-At-Risk (CMAR). The City of Fort Worth will negotiate a Pre-Construction Services Contract and later negotiate a Construction Services Contract, based on percentages established in the "Project Proposal Form" with the selected CMAR firm determined to have made the Best Value offer. Refer to the Instructions to Construction Manager-At-Risk (CMAR) Offerors documents for the Minority Business Enterprise (MBE) Information. MBE participation will be evaluated in awarding this contract. The MBE participation goal is 25% for the estimated construction budget. There is no goal for the Pre-Construction Services. The goal will be applied to the GMP when the GMP agreements are reached. Offerors must submit an anticipated MBE Utilization Plan with their CMAR Proposal submittal. The submitted Plan will be part of the weighted selection criteria. Refer to Instructions to Construction Manager-at-Risk (CMAR) Offerors for additional information. Contact the MW/BE Office at (817) 212-2674 to obtain a list of certified subcontractors and suppliers. Also, Refer to Section 3. BUSINESS DIVERSITY ENTERPRISE (BDE) ORDINANCE PROVISION in the Instructions to Construction Manager-at-Risk (CMAR) Offerors. Upon completing the negotiations with the selected CMAR firm, the City will recommend to the City Council to award the CMAR contract to the selected CMAR firm based on the negotiations and the agreed upon estimated construction budget. The CMAR contract will be adjusted based on the agreed upon Guaranteed Maximum Price (GMP) after the design is completed. The selected CMAR Contractor will be required to provide Payment and Performance Bonds and provide Contractors General Liability and Statutory Workers Compensation Coverage once the GMP is agreed upon. For questions, contact David Crabtree at dcrabtree@broaddususa.com & Debbie Fulwiler at dfulwiler@elementsofarc.com.
Under Construction
Conference / Convention Centers
$95,000,000.00
Public - City
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2022
August 12, 2023
1201 Houston St, Fort Worth, TX
Related To This Project
Fort Worth, TX
Bid Date: Aug 05 2022
Fort Worth, TX
Bid Date: Aug 05 2022
Fort Worth, TX
Bid Date: Aug 04 2022
Fort Worth, TX
Bid Date: May 08 2020
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Aug 04 2022
Fort Worth, TX
Bid Date: Feb 01 2022
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Jun 08 2022
Fort Worth, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.