EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 8, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Media, Pennsylvania. Completed plans call for the renovation of a municipal facility.

The County of Delaware's Public Works Department is soliciting proposals for SPRINKLER, PIPING, and FIRE PUMP MODIFICATIONS at GOVERNMENT CENTER COMPLEX. This project involves replacement of sprinkler piping systems and equipment, fire pumps, electrical power generators, related electrical power, related fire alarm, new plumbing domestic water and sanitary systems, new HVAC systems, and new electrical systems. Five Prime Construction Contracts: General Construction, Mechanical, Plumbing, Electrical, and Fire Suppression Work. Unless otherwise provided, in any supplement to these instructions to respondent, no respondent shall modify, withdraw, or cancel the proposal or any part thereof for sixty (60) days after the time designated for the receipt of proposal in the advertisement or Request for Proposal. For any questions regarding such, please contact Yasmeen Jackson, Purchasing Project Manager or Lisa L. Jackson, Director of Central Purchasing at (610) 891-4427. Bids must be submitted unconditionally. No bidder may withdraw bid within SIXTY (60) days after the scheduled closing time for receipt of bids. The Owner reserves the right to waive any informalities, or to reject any or all bids. Completion- 456 DAYS The project consists of: 1. Selective removals of general construction, HVAC, plumbing, and fire protection equipment and system components including sitework, ductwork, piping, Building Management System Controls, conduits, and wiring. 2. New fire pumps, piping, and related accessories. 3. New sprinkler piping, heat tracing, insulation, and accessories as indicated. 4. New fire pump room in the parking garage. 5. New exterior fire pump enclosure for the courthouse service. 6. New gas fired generators, gas piping, and accessories. 7. New HVAC systems, equipment, as indicated. 8. New plumbing systems, equipment as indicated. 9. New general construction and site development. 10. Testing, adjusting, and balancing. 11. Owner training. 12. Concrete work. 13. New wiring and electrical devices. 14. Construction phasing 15. Other work covered under this Contract as indicated or implied. General Construction Contract: a. Select Architectural removals as indicated. b. Select landscaping removals, and new landscaping. c. New parking garage fire pump room construction. d. New doors as indicated. e. New pump exterior enclosure concrete pad and both emergency generator concrete pad. f. Installation and finish of new louvers. g. Owner training. h. All drawings listed under the Architectural Drawings, Landscape Drawings, and Structural Drawings. i. All Work indicated in Division 02, 03, 04, 05, 07, 08, and 09 Specification Sections. Mechanical Contract: a. Remove existing HVAC equipment, ductwork, piping, generator engine exhaust, and all related accessories. b. New HVAC equipment, ductwork, piping, valves, and all related accessories. c. New heat tracing on existing mechanical piping. d. Furnish new louvers. e. HVAC Controls. f. Testing, adjusting, and balancing. g. Owner training. h. All drawings listed under the Mechanical and/or HVAC Drawings i. All Work indicated in Division 23 Specification Sections. 4. Plumbing Contract: a. Remove existing Plumbing equipment, piping, and all related accessories. b. New bollards, constructed in accordance with the Structural Documents. c. New Plumbing equipment, piping, valves, and all related accessories. d. Incoming gas service upgrades e. New sump pumps. f. New heat tracing on existing plumbing piping. g. New bollards, constructed in accordance with the Structural Documents. h. Testing, adjusting, and balancing. i. Owner training. j. All drawings listed under the Plumbing Drawings. k. All Work indicated in Division 22 Specification Sections. 5. Electrical Contract: a. Remove existing wiring, devices, substation, generator, all related accessories, and wiring to existing equipment. b. New emergency generator(s). c. New transformer(s) and pads. d. New lighting and power e. New wiring, breakers, and circuits to new equipment. f. New fire alarm devices and wiring g. Owner training. h. All drawings listed under the Electrical Drawings. i. All Work indicated in Division 26, and 28 Specification Sections.

Award

Municipal

$3,725,000.00

Public - County

Renovation

40

21

2

8

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems, Fire Pumps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage, Sump Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Radiators, Unit Heaters, Radiant Heating Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Excavation and Fill, Excavation, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
350
Active Projects
191
Bidding Soon
2,884
All Active Projects
1,407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sprinkler Piping and Fire Pump Modifications at Government Center Complex - General Construction, Fire Suppression Work, Plumbing, Mechanical and Electrical

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.