BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Saint Joseph, Michigan. Contact the soliciting agency for additional information.

Bids will be received for approximately 420,000 gallons of Asphalt Emulsion for sealcoating and patching in accordance with 2012 Michigan Department of Transportation specifications for Asphalt Emulsion. All materials/services furnished must be the best of their respective kinds (unless otherwise specified) and will be subject to our inspection and approval after delivery. If materials are rejected it will be held for disposition at your risk and expense. Bids will be received for approximately 130,000 gallons of prime coat for sealcoating in accordance with 2012 Michigan Department of Transportation specifications for Asphalt Emulsion. The quantity given is only approximate and the right is reserved by the Berrien County Road Department to accept delivery on more or less than the quantity bid upon. Any questions regarding bid specifications, please contact greg trail at 269-925-1196 ext 4405 or gtrail@bcroad.Org Except as hereinafter provided by Supplemental Specifications or Special Provisions, the method and manner of performing the work and the quantity and quality of materials to be furnished under this contract shall be in strict accordance with the current Standard Specifications for construction of the Michigan Department of Transportation and the current edition of the Michigan Manual of Uniform Traffic Control Devices. Owners Protective Liability Policy covering bodily injury and property damage protection shall be furnished to the Commission. Delivery: may 3rd, 2022 to october 1st, 2022 Prosecution of the Work - The Contractor shall begin the work within ten (10) days after being notified by the Department to do so, unless this is inconsistent with the progress clause, with full force and equipment adequate to complete the sections within the time limit therein fixed for completion. In case of failure to proceed with the work as rapidly as is provided in the progress clause, or if it appears any time that such work is not being prosecuted in such a manner as to insure its completion within time specified, the Department shall have the right to require the force and equipment as the Department shall deem necessary to bring the work up to the Progress Schedule; and in case of the Contractor's neglect to do so, the Department may place such working force and equipment on the work and charge the Contractor the cost of labor and such rental and depreciation rates for the plant and equipment as in its judgment is reasonable, and for such time as the plant and equipment are in service. Partial Payment - PAYMENT WILL BE MADE IN FULL IN NOT MORE THAN THREE (3) PARTIAL PAYMENTS, SUCH PAYMANTS TO BE MADE on the basis of ninety percent (90%) of the value of the work done, provided the work is progressing satisfactorily and the orders of the engineer have been compiled with an provided that the date for completion, or date granted as extension, has not passed, and provided that the amount is at least $2,000.00. A Certified Check or Cashier's Check or Bid Bond in the amount of not less than five (5) percent of the bid made payable to the Berrien County Road Commission shall accompany this proposal as guarantee of good faith. The Berrien County Board of Commissioners reserves the right to reject any and all bids or make any deviations deemed in the best interest of Berrien County.

Post-Bid

Roads / Highways

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
80
Bidding Soon
1,668
All Active Projects
716
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2022

May 3, 2022

img_map_placeholder

Multiple Locations, Saint Joseph, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.