BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Sacramento, California. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Y2134.00 Laurel Ruff School 5325 Garfield Ave., Sacramento, CA 95841 Oakview Community ES 7229 Beech Ave., Orangevale, CA 95662 Scope of Work including but not limited to: Re-roof upgrades site wide to include gutters; dry-rot repair; and roof drainage. Included in the bid docs is a list OFCI materials to be installed by contractor. Attendance for duration of meeting is mandatory and each prime contract bidder (hereinafter referred to as "Bidder" or "Bidders") is required to sign-in at both locations. The Bidders are required to certify, as part of its Proposal Form, that it attended the entirety of the Pre-Bid conference. Failure to include the certification will render the bid non-responsive. Notice is hereby given that the Project is a public works project within the requirements of Division 2, Part 7, Chapter 1 of the California Labor Code, and that each bidder and listed subcontractor is required to be registered pursuant to Labor Code section 1725.5 at the time of bidding. Failure of the bidder to be registered at the time of bidding shall render the bid non-responsive and unavailable for award. Bidder's listing of an unregistered subcontractor may render the bid non-responsive and unavailable for award unless such failure is the result of an inadvertent error and the provisions of Labor Code section 1771.1 apply. Overall coordination of the Project will be the responsibility of the District Representative. All inquiries regarding the bid are to be directed to Maria Mahon, Procurement Specialist - maria.mahon@sanjuan.edu, Facilities Business Department - facilitiesbusiness@sanjuan.edu, and cc: Meredith Collins, ICS - District representative, meredith@icscm.com. Contracts for construction will be direct prime contracts with the District. All Project procedures and documents are designed to facilitate delivery of the Project through prime construction contracts. The District's forms shall be used for all documents. Bidders shall read and review the Bidding Documents carefully and shall familiarize themselves thoroughly with all requirements. No bid will be considered unless it is accompanied by Cashier's Check, Certified Check or Bid Bond from a surety authorized to do business in California for ten percent (10%) of the total amount of the bid, including additive Alternate Bids, made payable to the District. The above-mentioned check or bid bond shall be given as a guarantee that the Bidder shall, if selected by the District, execute the Contract, in conformance with the Contract Documents. For more information, refer to Section 00 21 13, Article 1, Section 1.06. Bids shall not expire for a period of ninety (90) days after the date set for the bid opening. Within ten (10) days after notification of the District's Notice of Intent to Award the Contract, the successful Bidder will be required to furnish a Labor and Material Bond and a Faithful Performance Bond. For further information, refer to Sections 00 61 13.13 and 00 61 13.16. The District participates in all available rebate programs. The successful Bidder agrees to notify the District of any available rebate of which the successful Bidder is aware, and to provide the District with invoices and all other documentation necessary to claim any available rebate. The District will apply for available rebates, and the rebates will be paid directly to the District, not the successful Bidder. The successful Bidder shall have at least one supervising technician on call in the event that the existing fire alarm, security clocks, intercom, telephone and data systems are damaged during the course of construction or the Contract requires relocation of existing devices. The supervising technician is required to be on Site during all aspects of repair, modifications and testing. For fire alarm modifications and repairs the supervising technician is required to have at a minimum NICET LEVEL 2 Certification or equal. The District may consider optional Underwriters Laboratories Certification, factory training or contractor demonstrated equal experience/training with prior approval. The supervising technician must also have a minimum 5-years installation experience. Engineers Estimate: Laurel Ruff $1,000,000; Oakview $995,000

Award

Educational

$1,302,500.00

Public - County

Renovation, Site Work

57

24

61

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
45
Bidding Soon
1,498
All Active Projects
653
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2022

May 23, 2022

img_map_placeholder

Multiple Locations, Sacramento, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.