EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Berwyn, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Project Category Code: Sidewalks/Curbs/Gutters, Street/Road Repairs, Alley (Resurfacing or Reconstruction) Description: The proposed improvement consists of HMA surface removal; curb and gutter removal & replacement; alley pavement removal & replacement; sidewalk removal & replacement; driveway pavement removal & replacement; structure adjustments & replacement; combined sewer replacement; HMA surface course replacement; pavement markings; topsoil & sod; parkway restoration; and all appurtenant construction on Clinton Avenue - 26th Street to Riverside Drive, Grove Avenue - 26th Street to Riverside Drive, 25th Street - Grove Avenue to Oak Park Avenue, Scoville Avenue - 26th Street to 24th Street and Elmwood Avenue - 26th Street to 24th Street. Additonal Description: Please Note: The Sam.gov requirements on Page C-29 must be completed to submit a bid and to be awarded the contract.

Post-Bid

Roads / Highways

$931,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
171
Bidding Soon
2,257
All Active Projects
1,029
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2022

April 14, 2022

img_map_placeholder

Multiple Locations, Berwyn, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

PY 2021 CDBG Roadway and Sewer Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.