BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving and outdoor lighting for a mixed-use development in Covington, Georgia. Conceptual plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Newton County, SR 12/US 278 From SR 124 to SR 81. The City of Covington seeks proposals from interested qualified Engineering firms to provide engineering services consisting of roadway improvements along US 278/SR 12 in Covington, Georgia. The project includes improvements from the Interstate 20 Exit 90 park and ride near Turner Lake Road to Emory Street. Improvements include landscaping, sidewalks/trails, lighting, gateway signage, and utility relocations. All offerors must comply with all general and special requirements of the RFQ information and instructions. The City of Covington, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, part 21, Non-discrimination in federally-assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 23 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. The City of Covington reserves the right to reject any or all submissions and to award a contract in the best interest of the City and waive technicalities and informalities. Questions about any aspect of the RFQ, or the project, shall be submitted in writing via e-mail to: Jimmy Garrison, P.E. at garrison.j@tandh.com. The deadlines for submission of questions relating to the RFQ are the times. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$800,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
184
Bidding Soon
2,310
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

Project location map

Multiple Locations, Covington, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.