EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 24, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Sarasota, Florida. Completed plans call for site work for a water / sewer project.

Eight (8) areas within the City of Sarasota potable water distribution system have been identified for valve replacements. Within these eight (8) areas, the contractor shall provide all labor, equipment, tools, services, incidentals, maintenance of traffic, dewatering systems, trench shoring, warranties, insurances, project management, and all other provisions to meet the requirements in the contract documents.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation, Facility Remediation, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells, Athletic Equipment, Exercise Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Residential Furniture, Beds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Mowing, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Wetlands, Constructed Wetlands, Irrigation, Planting, Planting Preparation, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
63
Bidding Soon
985
All Active Projects
440
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2022

May 5, 2022

img_map_placeholder

Multiple Locations, Sarasota, FL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

FY2021 Valve Replacement Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.