Renovation of a military facility in Hill Air Force Base, Utah. Completed plans call for the renovation of a military facility.
Award Details Contract Award Date: Sep 26, 2022 Contract Award Number: W9123822C0023 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: NH1 JV Contractor Awarded Address: Highland, UT 840033749 USA Base and All Options Value (Total Contract Value): $21736639.00 The required response date/time has changed from 25-Jul-2022 09:00 AM to 01-Aug-2022 09:00 AM. The contractor period of performance end date has increased by 180 days from 730 days to 910 days. (1) The durations of the principle components of work with anticipated start and finish dates. (2) The total number of calendar days allocated to design. (3) The total number of calendar days allocated to construction. (4) The total number of calendar days from NTP to Project Complete. (5) For the purposes of proposal analysis only, Offerors should assume: (i) Contract award date of 05 SEPTEMBER 2022 (ii) Notice to Proceed date of 26 SEPTEMBER 2022 The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) has a new requirement to complete two-phase design-build construction services to upgrade the Steam Plant at B1286 on Hill AFB, UT. This project will include the replacement of three (3) existing boilers in B1286 with new dualfuel (natural gas/fuel oil) boilers that meet BACT. This option will require phasing the boiler replacement in the existing plants to maintain steam production for the existing load. The existing buildings will require new wall openings and an emergency boiler to maintain "N+1" boiler redundancy in the plants. The boilers in B1286 will be replaced with two (2) new 50 million Btu/hour (MMBH) boilers. The boilers will achieve ultra-low oxides of nitrogen (NOx) emissions of 9 parts per million (ppm). The existing boiler fuel oil underground storage tanks (USTs) in both buildings will be removed and replaced with aboveground storage tanks (AST), which are sized for seven days of storage during peak heating season. The existing buildings will have seismic retrofitting and supporting equipment (deaerator, pumps, etc.) upgraded. The Contractor shall develop and complete the designs and construct the facility. The Contractor will be given a "buildable area" boundary, to best locate/layout the proposed facility. The solicitation, plans, and specifications are available for inspection without charge when accessed through the GPE or when requested and delivered by electronic mail and/or data interchange. In accordance with DFARS 236.204(i), the magnitude of construction for this requirement is estimated to be between $10,000,000 and $25,000,000 The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not review capabilities statements submitted in response to this solicitation or coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and the solicitation. PLEASE NOTE: THIS PROJECT AND/OR THE PROPOSED CONTRACT ACTION MAY BE CHANGED, DELAYED, OR CANCELED AT ANY TIME. ____________________________________________________________________________ SAM Posting Amendment 0001 - Changes NAICS code from 238220 to 236220; Update sections 00 21 00 and 00 22 00. ________________________________________________________________________________________________________ SAM Posting Amendment 0002 - Establish Phase II proposal date and time submission; Update sections 00 21 00 and 00 22 00; issue updated attachments for Phase II; reopen Projnet; require bid guarantee for phase II proposals; add site visit information; revise line item structure. ________________________________________________________________________________________________________Sam Posting - Upload the site visit sign-in sheet and site visit agenda. ________________________________________________________________________________________________________ SAM Posting Amendment 0003 - Extend the solicitation proposal due date from 1:00 PM PST, 27 June 2022 to 1:00 PM PST 15 July 2022. ________________________________________________________________________________________________________ SAM Posting Amendment 0004 - Add feasibility study Attachment 13, and extend the solicitation proposal due date from 1:00 PM PST, 15 July 2022 to 9:00 PM PST 25 July 2022. ________________________________________________________________________________________________________ SAM Posting Amendment 0005 - Update sections, 00 21 00; 00 22 00; 00 73 00 and incorporate Government Furnished Property (GFP) provisions and clauses. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Military
$21,736,639.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2022
September 26, 2022
To Be Determined, Hill Air Force Base, UT
Related To This Project
Hill Air Force Base, UT
Bid Date: Aug 08 2022
Hill Air Force Base, UT
Bid Date: Jan 26 2023
Hill Air Force Base, UT
Bid Date: Mar 05 2024
Hill Air Force Base, UT
--
Hill Air Force Base, UT
--
Hill Air Force Base, UT
--
Hill Air Force Base, UT
Bid Date: Mar 27 2023
Hill Air Force Base, UT
Bid Date: Sep 27 2022
Hill Air Force Base, UT
Bid Date: Sep 26 2022
Hill Air Force Base, UT
Bid Date: Sep 08 2022
Hill Air Force Base, UT
--
Hill Air Force Base, UT
Bid Date: May 19 2023
Hill Air Force Base, UT
Bid Date: Aug 18 2022
Hill Air Force Base, UT
Bid Date: Aug 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.