BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2022 at 7:00 PM

Updated January 29, 2024

Renovation of an educational facility in Falls City, Oregon. Completed plans call for the renovation of a educational facility.

Remove and replace roof at the Elementary School Roofer Shall: 1. Remove1 layer of existing composition roofing and replace it with a new GAF asphalt composition roof system. 2. Remove existing metal roofing and replace it with new IB Roof Systems White 80 Mil Membrane roof system. 3. Give one bid for GAF HD Timberline and one bid for GAF Ultra Timberline roofing (alternate) complete roofing system. 4. Give one bid for IB Roof Systems White 80 Mil PVC Membrane complete roofing system. 5. Contractor/Installer of GAF system must be a GAF Master Elite Certified Contractor and provide written documentation from GAF of Master Elite Status. Additionally, contractor shall provide documentation that they are authorized to install this roofing system in the geographical area where the project is located. 6. Contractor to provide a GAF Commercial Golden Pledge Warranty upon completion. 7. Contractor/Installer of IB Roof Systems must be an IB Roof Systems certified Contractor/Installer and provide written documentation from IB Roof Systems verifying certification status. Additionally, contractor shall have a minimum of 5 years of installation experience of the system and provide documentation that they are authorized to install this roofing system in the geographical area where the project is located. 8. Provide at least 3 references of similar roofing projects completed within the past 5 years. 9. For both roofing systems on the project, GAF and IB Roof Systems, provide all necessary roofing system components to provide complete system as recommended by the manufacturer of the roofing system, regardless of whether or not identified in these specifications or by reference. Manufacturer's installation specifications shall supersede these specifications. Provide a complete system using the most stringent specification. Shingled roof: Shingle to be used GAF Timberline HDZ or GAF Ultra Timberline (alternate) Roofing Materials: Guardian double D ring roof anchors GAF Weather Watch Ice & Water Shield GAF Tiger Paw Underlayment GAF Pro Start Starter Shingle Strip GAF Ridge Glass SBS Ridge Cap GAF Cobra Intake Vent Roofing Coil Nails - 1 1/4'' Ventilation: RVO 38 Metal Vent or GAF approved equal Flashings: G - Style 1 3/8'' Flashing 1'' x 3'' Eave Flashing 24'' W - Valley 6'' x 8'' Step Flashing Pipe Flashings: 1 1/2 '' Ultimate Pipe Flashings 2'' Ultimate Pipe Flashings 4'' Ultimate Pipe Flashings

Post-Bid

Educational

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
13
Bidding Soon
1,000
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2022

June 20, 2022

Project location map

177 Prospect Ave, Falls City, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.