Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 31, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a water / sewer project in Fort Wayne, Indiana. Completed plans call for the renovation of a water / sewer project.
1. Provision of two new vertical mixed flow pumps (Pumps 5 & 6), each with a rated capacity of 211 mgd and each provided with a 2,000 horsepower induction motor and variable frequency drive (VFD) equipment. New equipment will be installed into existing facilities. 2. Provision of two new mechanically cleaned bar screens each with a rated capacity of 212 mgd. New equipment will be installed into existing facilities. 3. Upgrades to the existing HVAC system in the existing Wet Weather Pump Station to improve building ventilation. 4. Expansion of the existing HVAC system in the existing WWPS Electrical Building to provide additional cooling capacity. Work includes modifications to an existing air handling unit, provision of a new air handling unit, and associated HVAC Work. 5. Instrumentation and Control Work: New pumping and screening equipment shall be integrated with the existing PLC and SCADA system. Instrumentation and control Work includes enhancements to the existing PLC and SCADA system, provision of new field instrumentation, and other instrumentation and control Work. 6. Electrical Work associated with provision of the new pump-motor-VFD equipment, new screening equipment, HVAC equipment, and other work. 7. General construction work associated with installation of the new equipment into the existing facilities. 8. Replacement of the existing bridge crane in the WWPS Screen Facility with a new bridge crane. 1. Provision of two new vertical mixed flow pumps (Pumps 5 & 6), each with a rated capacity of 211 mgd and each provided with a 2,000 horsepower induction motor and variable frequency drive (VFD) equipment. New equipment will be installed into existing facilities. 2. Provision of two new mechanically cleaned bar screens each with a rated capacity of 212 mgd. New equipment will be installed into existing facilities. 3. Upgrades to the existing HVAC system in the existing Wet Weather Pump Station to improve building ventilation. 4. Expansion of the existing HVAC system in the existing WWPS Electrical Building to provide additional cooling capacity. Work includes modifications to an existing air handling unit, provision of a new air handling unit, and associated HVAC Work. 5. Instrumentation and Control Work: New pumping and screening equipment shall be integrated with the existing PLC and SCADA system. Instrumentation and control Work includes enhancements to the existing PLC and SCADA system, provision of new field instrumentation, and other instrumentation and control Work. 6. Electrical Work associated with provision of the new pump-motor-VFD equipment, new screening equipment, HVAC equipment, and other work. 7. General construction work associated with installation of the new equipment into the existing facilities. 8. Replacement of the existing bridge crane in the WWPS Screen Facility with a new bridge crane. 9. Other mechanical work. All questions not presented in this meeting are to be submitted to Chris Ravenscroft (e-mail: chris.ravenscroft@cityoffortwayne.org) no later than March 28, 2022
Award
Water / Sewer
$6,369,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2022
June 9, 2022
Multiple Locations, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: Apr 15 2022
Fort Wayne, IN
Bid Date: Jun 06 2022
Fort Wayne, IN
Bid Date: May 31 2022
Fort Wayne, IN
Bid Date: May 31 2022
Fort Wayne, IN
Bid Date: May 10 2022
Fort Wayne, IN
Bid Date: Jun 08 2022
Fort Wayne, IN
Bid Date: Apr 26 2022
Fort Wayne, IN
Bid Date: Jun 09 2022
Fort Wayne, IN
Bid Date: Apr 12 2022
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: Apr 14 2022
Fort Wayne, IN
Bid Date: Apr 04 2022
Fort Wayne, IN
Bid Date: Apr 06 2022
Fort Wayne, IN
Bid Date: May 24 2022
Fort Wayne, IN
Bid Date: Jan 11 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
