BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a mixed-use development in Santa Maria, California. Completed plans call for site work for a educational facility; and playground / park / athletic field.

Install District-provided playground equipment at Alvin Elementary School. Must be a certified playground installer of Game Time provided equipment prior to the start of Project. Must be a certified installer of Surfaces provided fall surface prior to the start of Project. Installation of play structure, fall surface, concrete flatwork, storage containers relocation, and some utility work associated site work. Liquidated Damages: 250 per Calendar Day Start/Delivery Date Anticipated Start Date 5/2/2022 Project Duration 45 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Q&A Deadline: 03/09/2022 5:00 PM (PST) This allows the School District to informally Bid small construction and maintenance projects with estimated costs of $60,000 to $200,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Owner reserves the right to reject any Bid as non responsive if a listed subcontractor is not licensed at the time the Bidder's Bid is submitted to Owner, whether or not the Bidder listed the unlicensed subcontractor inadvertently.

Bid Results

Playgrounds / Parks / Athletic Fields

$176,171.00

Public - City

Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
17
Bidding Soon
538
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2022

April 20, 2022

Project location map

301 E Alvin Ave, Santa Maria, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.