Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of an educational facility in Castle Dale, Utah. Completed plans call for the construction of a 143,271-square-foot, two-story above grade educational facility; and for site work for a educational facility.
Westland Construction, Inc., as Construction Manager for Emery School District, is requesting labor and material bids for the construction of the Emery High School Bid Package 2 in accordance with plans, specifications and bid documents as prepared by KMA Architects. Questions on scope of work, trade coordination and bidding should be directed to John Sheldon, Mark Petersen and Austin Kerr at Westland Construction and John Shepard at KMA Architects. A 5% BID SECURITY MUST BE ATTACHED FOR BIDS OVER $100,000. PLEASE SUBMIT COPY OF BID SECURITY VIA FAX OR EMAIL. Bid Security may be a bid bond made payable to the order of Westland Construction, Inc. The bid security of the accepted bidder shall be forfeited in the case of failure or refusal to enter into a contract and furnish payment and performance bonds as may be required. Time is of the essence on this project. Refer to the Bid Documents for specific schedule and liquidated damage requirements. Any award or rejection, in whole or in part, relating to this project is contingent upon budget restraints. Refer to the Bid Documents for Proposal Guidelines. The Owner and Construction Manager reserve the right to accept or reject any and all proposals or alternates with or without cause for any reason determined in its sole subjective determination to be in the Owner's best interest and to waive any informality in bidding. Proposals shall be properly executed upon the Bid Form with all items filled out. The completed form shall be without deletions, alterations, or erasures. Proposal forms are available at the office of the construction manager and in the specification manual. Before submitting a proposal, bidders shall carefully examine the plans, read the project manual, all addenda, and all other bid documents. They shall visit the site of work and shall fully inform themselves as to all existing conditions and limitations. They shall include in the proposal a sum to cover the cost of all items included in the bid documents and within the time frame stated in the bid documents. PN - 20-128
Post-Bid
Educational
$6,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2022
May 16, 2022
975 N Center St, Castle Dale, UT
Related To This Project
Castle Dale, UT
--
Castle Dale, UT
Bid Date: Mar 17 2022
Castle Dale, UT
Bid Date: Oct 17 2023
Castle Dale, UT
Bid Date: Feb 15 2024
Castle Dale, UT
Bid Date: Feb 26 2024
Castle Dale, UT
Bid Date: Mar 07 2024
Castle Dale, UT
Bid Date: Mar 11 2024
Castle Dale, UT
Bid Date: Mar 07 2024
Castle Dale, UT
Bid Date: Feb 17 2022
Castle Dale, UT
Bid Date: Nov 15 2021
Castle Dale, UT
Bid Date: Aug 08 2023
Castle Dale, UT
Bid Date: May 18 2023
Castle Dale, UT
Bid Date: May 17 2023
Castle Dale, UT
Bid Date: Apr 20 2023
Castle Dale, UT
Bid Date: Mar 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.