BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 10, 2022 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Vallejo, California. Contact the soliciting agency for additional information.

The work requires that the vendor or the vendor's installation subcontractor be licensed by the State of California as a C10 Electrical Contractor with EVITP certification. Ideally the vendor should have a minimum of three (3) years of experience with electric charging station installations. The work to be done includes: All aspects of design, installation, function testing, system use training for City employees as necessary to furnish and install ten (10) charging stations at the Corporation Yard and four (4) charging stations at the Fleming Hill Water Treatment Plant. More specifically this includes, but may not necessarily be limited to the following: Design and preparation of specifications and plans for the proposed locations per City, PG&E, and Industry standards and all applicable building and electrical codes; Securing and complying with City Encroachment and Building permits and obtaining and renewing annually, a City Business license; Installation of Level 2 chargers, electrical conduits, breakers, transformer, subpanel, and electric connection to supply power for the complete installation and operation of the EV chargers; Furnishing Chargepoint CPF50 Chargers or approved equal, EV charger material and equipment for a complete in place system; Installation of signage, pavement markings and restoration of existing conditions; Restoration of (1) parking spot to conform to ADA standards; Testing and commission of the EV charger stations; Installation and enabling for city fleet access and power sharing between the chargers; Providing timely maintenance services and customer support for a period of three years from the date the City accepts the project as complete. Start/Delivery Date July 2022 Project Duration 90 Days + 3 Years Maintenance Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%

Post-Bid

Service Station / Car Wash

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
12
Bidding Soon
1,718
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2022

July 29, 2022

Project location map

Multiple Locations, Vallejo, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.