Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Chico, California. Contact the soliciting agency for additional information.
Per the owner, as of October 7, 2022, this solicitation has been awarded. Closed solicitation has been included below for reference. ……………….. The City of Chico (City or Local Agency) is requesting proposals from licensed professional firms (Proposers) to enter into a contract for Construction Management & Inspection, and Materials Testing Services associated with construction of the City's Bikeway 99 Phase 5 Project (Project). The Project will construct a 0.44-mile Class I bicycle and pedestrian facility adjacent to the east side of State Route 99 (SR99), including an overcrossing at East 20th Street and SR99. Project PS&E documents are currently at 95% development. Plans are posted as a Supplemental Document to this RFP. Specifications will not be posted prior to the RFP due date. The Engineer's constructions cost estimate is $10.8 million. Construction is anticipated to commence in early 2023, and is estimated to last 16 months, including a four-month lead-time for submittals and fabrication work. Work will generally take place during the day; however, 45 evenings of night work are anticipated. Background: Bikeway 99 is an approximately 7-mile Class I and Class II/III regional bicycle and pedestrian facility that generally parallels SR 99 from the City's northern limits at Eaton Road to the southern limits near Southgate Avenue. Consistent with the City of Chico 2030 General Plan and 2019 Chico Bicycle Plan, the bikeway is a critical component to the City's overall bicycle network serving as the north/south "backbone" infrastructure providing linkage to numerous east/west bicycle facilities. Development of Bikeway 99, which began in 2009, has occurred in phases as federal, state and local funding has become available. Phases 1, 2, 3 and 4 are complete and the engineering design is nearly completed for Phase 5. Project Location: Bikeway Phase 5 extends approximately 0.44 linear miles along the eastern frontage of SR 99 from the southern terminus of Phase 3, adjacent to Chico Marketplace, to the norther terminus of Phase 4, adjacent to Walmart. Funding: Construction Management & Inspection, and Materials Testing Services will be funded with federal Active Transportation Program (ATP) grant funds and local funds. All submittals shall be submitted in a sealed envelope or container, and clearly marked with the RFP number and title on the outside of the parcel. The City reserves the right to waive minor defects and/or irregularities in proposals and shall be the sole judge of the materiality of any such defect or irregularity. All costs associated with proposal preparation shall be borne by the proposer. At the completion of successful cost negotiations with the top-ranked consultant, all remaining sealed envelopes containing cost proposals will be returned to consultants. All proposals shall remain firm for one-hundred-twenty (120) days following the closing date for the receipt of proposals. The method of contractor selection has not been determined at this time.
Award
Roads / Highways
$1,610,584.00
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2022
CA-99, Chico, CA
Related To This Project
Chico, CA
Bid Date: Sep 21 2022
Chico, CA
Bid Date: Aug 04 2022
Chico, CA
--
Chico, CA
Bid Date: Dec 09 2022
Chico, CA
Bid Date: Dec 15 2020
Chico, CA
Bid Date: Sep 22 2021
Chico, CA
Bid Date: May 05 2022
Chico, CA
Bid Date: Oct 14 2022
Chico, CA
Bid Date: Aug 24 2023
Chico, CA
Bid Date: Nov 02 2022
Chico, CA
Bid Date: Oct 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.