BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Lodi, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work consists of rehabilitating approximately 129,000 square yards of asphalt concrete pavement with fiberized slurry seal, asphalt rubber chip seal, and other incidental and related work, all as described in the specifications for the above project. If you do bid, submit your bid on the separate bid proposal. Be sure to include the necessary bid bond. Due to recent legislation, the City of Lodi is now required to verify that sureties are admitted to do bonding work within the State of California. The Contractor will be required to utilize the Virtual Project Manager (VPM) online website for the duration of the project. The online account is free to the Contractor and must be utilized for all submittals, RFIs, pay requests, and all other project-related correspondence. See Section 6-04.04 "Online Project Management Software of the Special Provisions for additional information. The Contractor agrees to commence work within 15 calendar days after both parties have signed the contract and to complete the work within 60 calendar days. Upon signing the contract, Contractor agrees that length of time of the contract is reasonable. Per Senate Bill 854, contractors and listed subcontractors must be registered with the Department of Industrial Relations (DIR) prior to submitting bids to any public work contracts. Failure to comply will make bids non-responsive. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with DIR pursuant to Labor Code Section 1725.5. The prime contractor on this project shall possess a valid State of California Class A, C-12, or C-32 contractor's license. The City Council reserves the right to reject any or all bids and to waive any informality in the completion of such forms, and to award to the lowest responsible bidder. The list of plan holders and the bid results will be available on the ciplist.com website. Bid results will be available four hours after the bid opening.

Bid Results

Roads / Highways

$1,198,240.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
51
Bidding Soon
1,836
All Active Projects
781
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2022

June 6, 2022

img_map_placeholder

Multiple Locations, Lodi, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.