BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 30, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Ross River, Yukon Territory. Completed plans call for site work for a bridge / tunnel.

Brief Description of the Work: Replacement of the Lapie River #2 Bridge includes; construction of a new single-span steel girder bridge with a pre-cast concrete deck, temporary detour works, associated approach road works, and demolition of the existing two-span bailey bridge. Community where work will occur: Ross River, Yukon Traditional Territory where work will occur: Ross River Dena Council, Liard First Nation Documents can be obtained from https://yukon.bidsandtenders.ca/ Question Deadline: Wed Mar 30, 2022 12:00:00 PM (YST)

Award

Bridges / Tunnels

$7,046,860.00

Public - State/Provincial

Site Work

34

43

8

5

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

June 6, 2022

Project location map

Canol Rd, Ross River, YT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.