BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Elkridge, Maryland. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

Howard County intends to procure the services of a construction firm to construct improvements at Troy Park in Elkridge, between Field 1 and the existing parking lot. Improvements will include: removal of existing asphalt walkway, installation of storm drains and grading the area as shown on the contract drawings, construction of a restroom/storage building, construction of a retaining wall and stairs from the sidewalk to the field level, paving, stabilization and landscaping as shown on the contract drawings A new comfort station building consisting of toilet rooms and a storage space. Two structural systems are used consisting of steel columns with glu-laminated beam roof framing or steel beam roof framing. The exterior envelope includes masonry veneer (below) and metal wall panels (above) over insulation on concrete masonry units. The roof is constructed out of standing seam metal on insulation and wood decking over glu-laminated beam roof framing or steel decking over steel beam roof framing. The building includes unit heaters and provides basic power and lighting. 3. Miscellaneous site work consists of: a. Concrete sidewalks for access from the existing parking lot to the new structure and bleachers, b. Various concrete and paver plazas associated with the proposed structures c. Water and sewer service connections including water fountain, connections to infrastructure contracted under the Site Contract d. Storms drainage systems e. Landscaping f. Furniture and accessories including benches and trash receptacles The Phase II construction of Troy Park is bounded by I-95 to the west, route 100 to the south, route 1 to the east, and the Troy Hill Commerce Center to the north.

Award

Playgrounds / Parks / Athletic Fields

$1,811,500.00

Public - County

Subscribe For Documents

66 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
89
Bidding Soon
2,247
All Active Projects
884
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2022

May 13, 2022

img_map_placeholder

6500 Mansion Ln, Elkridge, MD

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.