BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Parshall, North Dakota. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

*As of May 12, 2022, project was awarded to Asphalt Surface Technologies Corp, awarded amount is $153,718.96* Custom BT Division 1-5 - American Road Maintenance - $127,717.65 Division 6 - American Road Maintenance - $1,264.80 Each bid shall be accompanied by a separate envelope containing a Bid Bond in a sum equal to five percent (5%) of the maximum bid price, executed by the Bidder as principal and by a surety company authorized to do business in the State of North Dakota, payable to the Parshall Municipal Airport Authority, conditioned that if the principal's bid be accepted and the contract awarded to him, he, within ten (10) days after Notice of Award has been executed, will execute and effect a contract in accordance with the terms of his bid and a contractor's bond as required by law and regulations and determinations of the governing board. The bid security of the two lowest bidders will be retained until the Notice of Award has been executed, but no longer than 90 days. The bid security is a guarantee that the bidder will enter into contract for work described in the Proposal The successful Bidder will be required to furnish a Contract Performance Bond and Payment Bond in the full amount of the Contract. The Parshall Municipal Airport Authority, Parshall, North Dakota, reserves the right to hold all bids for a period of 90 days after the date fixed for the opening thereof to reject any and all bids and waive defects and to accept any bids should it be deemed for the public good and also reserves the right to reject the bid of any party who has been delinquent or unfaithful in the performance of any former contract to the Owner The successful Bidder will have to obtain a statement from the Office of the State Tax Commissioner showing that all taxes due and owing to the State of North Dakota have paid before the contract can be executed. Goals for minority participation for each trade: 4.4% Goals for female participation in each trade: 6.9% A pre-bid meeting will not be held for this project. Pavement rehabilitation work including asphalt pavement crack sealing, large crack repair (hot pour), existing pavement marking removal, emulsified asphalt surface treatment, pavement friction testing, and new pavement marking. Goals for minority participation for each trade: 4.4% Goals for female participation in each trade: 6.9%

Award

Transportation Terminals

$153,719.00

Public - City

Paving, Site Work

16

9

7

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
2
Bidding Soon
44
All Active Projects
14
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2022

May 24, 2022

img_map_placeholder

4th St W, ,, Parshall, ND


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.