BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Saco, Maine. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The City of Saco is soliciting bids for a replacement slab top to a wet well at the Windy Point Pump Station and a replacement of a slab top to the valve pit at the Factory Island Pump Station. Any questions regarding the bid specifications should be directed to Stacy Thompson, Deputy Director of the Water Resource Recovery Department by emailing sthompson@sacomaine.org or by calling (207) 282-3564. Windy Point Scope of Work: o All excavation work to be done by contractor. o Remove and replace existing slab top on the 2nd wet well with new one. o Removal of old slab shall include disposal. o New slab top shall be an 8' ID precast concrete slab top with: o One 30" x 48" pedestrian rated double leaf aluminum access hatch with safety grate. o All sealant needed between the new top and old structure. o A 6" core will need to be made on top of new slab top for existing vent pipe. o Site cleanup done by contractor. o No bypass pumping will be needed at this site. o All above work to be performed in accordance with the standard practices for above work and completed in a substantial workmanlike manner. o See Appendix A for more detail on wet well. Factory Island Scope ofWork: o All excavation work to done by contractor. o Remove and replace existing slab top on valve chamber with new one. O Removal of old slab shall include disposal. o New slab top will be a 10' ID precast concrete slab top with: O One 30" x 54" H-20 rated double leaf aluminum access hatch with safety grate. o All sealant needed between the new top and old structure. o Removal and replacement ofthree (3) 6" plug valves in valve pit. o One or two pumper trucks will be needed at this site to bypass the force main when plug valves are being replaced. Contractor shall coordinate with the City of Saco WRRD. o Site cleanup done by contractor. o All above work to be performed in accordance with the standard practices for above work and completed in a substantial workmanlike manner. o See Appendix B for more detail on valve pit.

Bid Results

Water / Sewer

$43,701.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
52
Bidding Soon
956
All Active Projects
336
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.