Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Saco, Maine. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The City of Saco is soliciting bids for a replacement slab top to a wet well at the Windy Point Pump Station and a replacement of a slab top to the valve pit at the Factory Island Pump Station. Any questions regarding the bid specifications should be directed to Stacy Thompson, Deputy Director of the Water Resource Recovery Department by emailing sthompson@sacomaine.org or by calling (207) 282-3564. Windy Point Scope of Work: o All excavation work to be done by contractor. o Remove and replace existing slab top on the 2nd wet well with new one. o Removal of old slab shall include disposal. o New slab top shall be an 8' ID precast concrete slab top with: o One 30" x 48" pedestrian rated double leaf aluminum access hatch with safety grate. o All sealant needed between the new top and old structure. o A 6" core will need to be made on top of new slab top for existing vent pipe. o Site cleanup done by contractor. o No bypass pumping will be needed at this site. o All above work to be performed in accordance with the standard practices for above work and completed in a substantial workmanlike manner. o See Appendix A for more detail on wet well. Factory Island Scope ofWork: o All excavation work to done by contractor. o Remove and replace existing slab top on valve chamber with new one. O Removal of old slab shall include disposal. o New slab top will be a 10' ID precast concrete slab top with: O One 30" x 54" H-20 rated double leaf aluminum access hatch with safety grate. o All sealant needed between the new top and old structure. o Removal and replacement ofthree (3) 6" plug valves in valve pit. o One or two pumper trucks will be needed at this site to bypass the force main when plug valves are being replaced. Contractor shall coordinate with the City of Saco WRRD. o Site cleanup done by contractor. o All above work to be performed in accordance with the standard practices for above work and completed in a substantial workmanlike manner. o See Appendix B for more detail on valve pit.
Bid Results
Water / Sewer
$43,701.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 19, 2022
May 19, 2022
Multiple Locations, Saco, ME
Related To This Project
Saco, ME
--
Saco, ME
Bid Date: Jun 09 2022
Saco, ME
--
Saco, ME
Bid Date: Jul 21 2022
Saco, ME
--
Saco, ME
Bid Date: Dec 14 2022
Saco, ME
Bid Date: Aug 31 2022
Saco, ME
Bid Date: Nov 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.