BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Brewer, Maine. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Bids are requested for two resurfacing projects with sidewalk and curb improvements on North Main Street and State Street in the City of Brewer. The two projects will be combined into one large contract. The project on North Main Street includes a 1 1/2 " mill and fill of the main travel way and shoulders from curb to curb from Wilson Street to State Street. Some new curbing, mostly granite, will be installed in designated locations and sidewalk reconstruction will happen in select areas. Some areas of curb will be remove and reset with sidewalk reconstruction. The project on State Street consists of a 2" mill and fill of the main travel way and shoulders from curb to curb from Eastern Avenue to just beyond Mullen Way. A new ramp will be constructed at the Joseph Ferris Community Center (formerly Brewer Auditorium) and the sidewalks will have a 1" overlay installed on them. This project will also have a bid alternate to remove and replace all the bituminous curb in this section of roadway with slipform concrete curb. A traffic control plan will be required for paving and milling operations for both sections of roadway. The Contractor will have to submit the plan to the City of Brewer for approval. The Contractor will need to have a plan in place specifically for truck traffic. The Contractor will not be allowed to begin work until this plan has been approved. Note that State of Maine prevailing wage rates apply to this project. Prospective contractors should note that this project must be completed before October 28, 2022. The contractor should also note that a separate storm drain project needs to be completed on State Street prior to the resurfacing project. That storm drain project has a deadline of July 29, 2022 for completion. The City of Brewer, Maine holds the exclusive right to reject or accept all or part of any or all bids received.

Post-Bid

Roads / Highways

$80,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
7
Bidding Soon
148
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2022

April 28, 2022

img_map_placeholder

N Main St & State St, Brewer, ME


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.