Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Green Bay, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Construction, Miscellaneous, Concrete Walkway, Electrical Installation/Construction, Landscaping, Stormwater Improvements, Pavers/Permeable Pavers, Concrete/Formed/Flatwork/Foundation, Docks, Furniture, Fixtures, Equipment, Grade, Surface and Bridge, Irrigation, Marine Work, Sidewalks/Curbs/Gutters, Steel Sheet Pile Wall, Storm Drain and Paving. the City of Green Bay Standard Specifications and Construction Standards for Public Works Construction, 2020 Edition, 2021 Edition - Supplemental Standard Specifications, and the special provisions of this contract, all of which are on file in the City Clerk's/Treasurer's Office and the Director of Public Works Office in the Green Bay City Hall. The work under this Contract shall consist of storm water improvements, concrete and paver paths, site furnishings, seat walls, stairs, landscaping, electrical, and all incidental items necessary to complete the work as shown on the plans. The work shall be let in accordance with the following Sections of the Wisconsin Statutes. 1. Section 62.15 regarding public works construction. 2. Section 779.15 regarding lien on contractors. 3. Section 66.0901(2) regarding proof of responsibility. All bidders shall provide proof of responsibility on the form furnished by the Director of Public Works and it shall be filed with the Director of Public Works not less than five (5) days prior to the time set for opening of bids. Said proof of responsibility shall not be valid if filed prior to one year of the date of opening bids. In accordance with Section 42-2 of the City of Green Bay Code of Ordinances, any corporation, firm, or individual violating Chapter 133.01 of the Wisconsin Statutes, or any subsequent amendment thereof, shall upon conviction thereof be thereby disqualified as a bidder on any City of Green Bay project for a period of three (3) years from the date of such conviction; however, nothing herein shall be interpreted to preclude such corporation, firm, or individual from completing any and all contracts he/she may already have with the City at the time of such conviction, nor shall this ordinance be applied retroactively to convictions occurring prior to the Additonal Description: adoption and publication of this ordinance. This prohibition applies with like force to officers of convicted corporations, firms, or individuals who thereafter have business interest in new corporations or business enterprises of whatever kind or description. The City of Green Bay, Wisconsin reserves the right to reject any or all bids and to waive any informality in bidding. No bids shall be withdrawn after the opening of bids without the consent of the City of Green Bay, Wisconsin for a period of sixty (60) days after the scheduled time for closing bids. All proposals must be submitted through online via their electronic vBid online bid service provided for that purpose and issued to the specific bidder by the Director of Public Works together a bid bond equal to at least five (5) but not more than ten (10) percent of the bid payable to the City of Green Bay as a guarantee that if his/her bid is accepted, Only the Proposal Pages, Bid Bond, Affidavit of Compliance, Disclosure of Ownership and any Addenda issued shall be submitted. Only Proposals submitted by firms appearing on the City of Green Bay list of plan holders will be opened. The Redevelopment Authority of the City of Green Bay, Wisconsin, reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the Redevelopment Authority of the City of Green Bay, Wisconsin, for a period not to exceed sixty (60) days from the date of the opening for purposes of reviewing the bids and investigating the qualifications of bidders prior to awarding of the Contract.
Bid Results
Water / Sewer
$6,010,526.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 12, 2022
May 12, 2022
To Be Determined, Green Bay, WI
Related To This Project
Green Bay, WI
Bid Date: Apr 12 2022
Green Bay, WI
Bid Date: Mar 24 2022
Green Bay, WI
--
Green Bay, WI
Bid Date: May 03 2022
Green Bay, WI
Bid Date: May 03 2022
Green Bay, WI
Bid Date: May 03 2022
Green Bay, WI
Bid Date: May 31 2022
Green Bay, WI
Bid Date: May 17 2022
Green Bay, WI
--
Green Bay, WI
Bid Date: May 18 2022
Green Bay, WI
Bid Date: Mar 28 2022
Green Bay, WI
Bid Date: May 02 2022
Green Bay, WI
Bid Date: Apr 12 2022
Green Bay, WI
Bid Date: Mar 31 2022
Green Bay, WI
Bid Date: Apr 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.