BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Tuskegee Institute, Alabama. Completed plans call for the renovation of a 28,740-square-foot, three-story above grade educational facility.

Tuskegee University's Campbell Hall Renovations & MEP Upgrades. - Teaching and Learning Laboratories Demolition, Mold Remediation, Renovations and Mechanical Systems Upgrades for Campbell Hall Teaching and Learning Laboratories Campbell Hall Laboratory Renovations MEP incl. Fire Protection Upgrades Mold Remediation Interior and Exterior Renovations The project is based on the modernization of a three-story 28,740 SF building referred to as Campbell Hall. The scope of work is included but not limited to: Selective demolition of walls, doors, flooring, toilet partitions and accessories, plumbing fixtures, HVAC equipment and interior lighting. Mold and hazardous materials removal and remediation. New lab casework and cabinetry in specified areas. Upgrade roofing insulation in select areas to improve the overall energy efficiency. New ADA doors and door hardware. New solar blinds at all windows to improve energy efficiency. New interior glass storefronts to allow natural lighting and transparency within research areas. Replace interior walls in specified areas throughout the building; completely replace walls that were infiltrated by mold and mildew. Replace all flooring, ceilings and epoxy paint throughout the building. Replace all toilet partitions and accessories in restrooms. restrooms are to be ADA accessible. Replacing the existing elevator by upgrading to an efficient model. Providing a design-build Fire Protection Sprinkler System throughout the building spaces and a fire suppression system in laboratories as required by code Modifying the existing HVAC system and install new HVAC equipment and components to provide an energy efficient heating and cooling system. Provide major upgrades and maintenance measures to the existing HVAC system. Installing a new centralized smart controls and energy conservation system to regulate the HVAC system as it automatically adjusts to increased body and equipment temperatures during high and low peak occupancy and operational hours.

Post-Bid

Educational

$1,360,000.00

Public - City

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
23
Bidding Soon
451
All Active Projects
187
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

June 13, 2022

img_map_placeholder

1200 W Montgomery Rd, Tuskegee Institute, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.