Site work, paving and outdoor lighting for a mixed-use development in West Chicago, Illinois. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work as shown on the plans and as specified herein consists mainly of roadway resurfacing, water main installation, concrete flat work, and the installation of new street lights. The work is to be performed on and along Allen Avenue, Barber Street, Blakely Street, all from Augusta Avenue to Glen Avenue; Bishop Street from Roosevelt Road (IL Route 38) to Forest Avenue; Augusta Avenue from Joliet Road to Neltnor Boulevard (IL Route 59); and Glen Avenue from Joliet Road to Bishop Street. The net length of roadway improvements is approximately 8,532 feet (1.62 miles) within the City of West Chicago in DuPage County. The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, 8" ductile iron water main and water main services installation, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, parkway/ditch restoration, manhole structure repair and adjustments, new street lights, thermoplastic pavement markings and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein. Minorities and women owned businesses (MBE/WBE) are encouraged to submit bids on this project. Bids shall be accompanied by a bid deposit in the amount of 5% of the bid. Bid bond shall be in the form of a bid bond (IDOT form 12230 or equal), certified check or cashier's check drawn on a responsible bank doing business in the United States and shall be made payable to the City of West Chicago. All bids not accompanied by a bid deposit will be rejected. The successful bidder shall furnish a Performance Bond and a Labor-Mechanical Payment Bond, both in the amount of one hundred percent (100%) of the bid amount as a security for the faithful performance of this contract and as a security for the payment of all persons performing labor on the project under this contract and furnishing materials in connection with this Contract, respectively. No bidder may withdraw his/her bid after the scheduled closing time for a period of ninety (90) days. This project is partially funded by the Community Development Block Grant funds. Successful bidder will be required to follow all grant requirements. The City reserves the right to reject any and all bid proposals, to waive any informality in any bid proposal, to re-advertise the proposed services, and to accept the proposal most advantageous to the City. The work as shown on the plans and as specified herein contains quantities for intermittent sidewalk removal and replacement. The project is located throughout the City of West Chicago, with the majority of the project's improvements located within residential neighborhoods. The work as shown on the plans and as specified herein consists mainly of roadway resurfacing, concrete flat work, and the installation of new street lights. The work is to be performed on and along Allen Avenue, Barber Street, Blakely Street, all from Augusta Avenue to Glen Avenue; Bishop Street from Roosevelt Road (IL Route 38) to Forest Avenue; Augusta Avenue from Joliet Road to Neltnor Boulevard (IL Route 59); and Glen Avenue from Joliet Road to Bishop Street. The net length of roadway improvements is approximately 8,532 feet (1.62 miles) within the City of West Chicago in DuPage County. The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, 8" ductile iron water main and water main services installation, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, parkway/ditch restoration, manhole structure repair and adjustments, new street lights, thermoplastic pavement markings and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein. All quantities, unless noted otherwise, will be used in determining the lowest responsible bidder. The ENGINEER reserves the right, during construction, to alter the locations and/or quantities in the "Summary of Quantities".

Bid Results

Roads / Highways

$1,447,325.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting, Roadway Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
154
Bidding Soon
2,323
All Active Projects
1,013
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

May 30, 2022

img_map_placeholder

Multiple Locations, West Chicago, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Fair Meadows Subdivision Rehabilitation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.