BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in West Chicago, Illinois. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work as shown on the plans and as specified herein consists mainly of roadway resurfacing, water main installation, concrete flat work, and the installation of new street lights. The work is to be performed on and along Allen Avenue, Barber Street, Blakely Street, all from Augusta Avenue to Glen Avenue; Bishop Street from Roosevelt Road (IL Route 38) to Forest Avenue; Augusta Avenue from Joliet Road to Neltnor Boulevard (IL Route 59); and Glen Avenue from Joliet Road to Bishop Street. The net length of roadway improvements is approximately 8,532 feet (1.62 miles) within the City of West Chicago in DuPage County. The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, 8" ductile iron water main and water main services installation, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, parkway/ditch restoration, manhole structure repair and adjustments, new street lights, thermoplastic pavement markings and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein. Minorities and women owned businesses (MBE/WBE) are encouraged to submit bids on this project. Bids shall be accompanied by a bid deposit in the amount of 5% of the bid. Bid bond shall be in the form of a bid bond (IDOT form 12230 or equal), certified check or cashier's check drawn on a responsible bank doing business in the United States and shall be made payable to the City of West Chicago. All bids not accompanied by a bid deposit will be rejected. The successful bidder shall furnish a Performance Bond and a Labor-Mechanical Payment Bond, both in the amount of one hundred percent (100%) of the bid amount as a security for the faithful performance of this contract and as a security for the payment of all persons performing labor on the project under this contract and furnishing materials in connection with this Contract, respectively. No bidder may withdraw his/her bid after the scheduled closing time for a period of ninety (90) days. This project is partially funded by the Community Development Block Grant funds. Successful bidder will be required to follow all grant requirements. The City reserves the right to reject any and all bid proposals, to waive any informality in any bid proposal, to re-advertise the proposed services, and to accept the proposal most advantageous to the City. The work as shown on the plans and as specified herein contains quantities for intermittent sidewalk removal and replacement. The project is located throughout the City of West Chicago, with the majority of the project's improvements located within residential neighborhoods. The work as shown on the plans and as specified herein consists mainly of roadway resurfacing, concrete flat work, and the installation of new street lights. The work is to be performed on and along Allen Avenue, Barber Street, Blakely Street, all from Augusta Avenue to Glen Avenue; Bishop Street from Roosevelt Road (IL Route 38) to Forest Avenue; Augusta Avenue from Joliet Road to Neltnor Boulevard (IL Route 59); and Glen Avenue from Joliet Road to Bishop Street. The net length of roadway improvements is approximately 8,532 feet (1.62 miles) within the City of West Chicago in DuPage County. The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, 8" ductile iron water main and water main services installation, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, parkway/ditch restoration, manhole structure repair and adjustments, new street lights, thermoplastic pavement markings and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein. All quantities, unless noted otherwise, will be used in determining the lowest responsible bidder. The ENGINEER reserves the right, during construction, to alter the locations and/or quantities in the "Summary of Quantities".

Bid Results

Roads / Highways

$1,447,325.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
118
Bidding Soon
1,786
All Active Projects
792
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

May 30, 2022

img_map_placeholder

Multiple Locations, West Chicago, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.