Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in West Chicago, Illinois. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The work as shown on the plans and as specified herein consists mainly of roadway resurfacing, water main installation, concrete flat work, and the installation of new street lights. The work is to be performed on and along Allen Avenue, Barber Street, Blakely Street, all from Augusta Avenue to Glen Avenue; Bishop Street from Roosevelt Road (IL Route 38) to Forest Avenue; Augusta Avenue from Joliet Road to Neltnor Boulevard (IL Route 59); and Glen Avenue from Joliet Road to Bishop Street. The net length of roadway improvements is approximately 8,532 feet (1.62 miles) within the City of West Chicago in DuPage County. The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, 8" ductile iron water main and water main services installation, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, parkway/ditch restoration, manhole structure repair and adjustments, new street lights, thermoplastic pavement markings and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein. Minorities and women owned businesses (MBE/WBE) are encouraged to submit bids on this project. Bids shall be accompanied by a bid deposit in the amount of 5% of the bid. Bid bond shall be in the form of a bid bond (IDOT form 12230 or equal), certified check or cashier's check drawn on a responsible bank doing business in the United States and shall be made payable to the City of West Chicago. All bids not accompanied by a bid deposit will be rejected. The successful bidder shall furnish a Performance Bond and a Labor-Mechanical Payment Bond, both in the amount of one hundred percent (100%) of the bid amount as a security for the faithful performance of this contract and as a security for the payment of all persons performing labor on the project under this contract and furnishing materials in connection with this Contract, respectively. No bidder may withdraw his/her bid after the scheduled closing time for a period of ninety (90) days. This project is partially funded by the Community Development Block Grant funds. Successful bidder will be required to follow all grant requirements. The City reserves the right to reject any and all bid proposals, to waive any informality in any bid proposal, to re-advertise the proposed services, and to accept the proposal most advantageous to the City. The work as shown on the plans and as specified herein contains quantities for intermittent sidewalk removal and replacement. The project is located throughout the City of West Chicago, with the majority of the project's improvements located within residential neighborhoods. The work as shown on the plans and as specified herein consists mainly of roadway resurfacing, concrete flat work, and the installation of new street lights. The work is to be performed on and along Allen Avenue, Barber Street, Blakely Street, all from Augusta Avenue to Glen Avenue; Bishop Street from Roosevelt Road (IL Route 38) to Forest Avenue; Augusta Avenue from Joliet Road to Neltnor Boulevard (IL Route 59); and Glen Avenue from Joliet Road to Bishop Street. The net length of roadway improvements is approximately 8,532 feet (1.62 miles) within the City of West Chicago in DuPage County. The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, 8" ductile iron water main and water main services installation, PCC curb and gutter removal and replacement, PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, parkway/ditch restoration, manhole structure repair and adjustments, new street lights, thermoplastic pavement markings and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein. All quantities, unless noted otherwise, will be used in determining the lowest responsible bidder. The ENGINEER reserves the right, during construction, to alter the locations and/or quantities in the "Summary of Quantities".
Bid Results
Roads / Highways
$1,447,325.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2022
May 30, 2022
Multiple Locations, West Chicago, IL
Related To This Project
West Chicago, IL
Bid Date: May 06 2020
West Chicago, IL
Bid Date: Nov 06 2019
West Chicago, IL
Bid Date: Feb 13 2023
West Chicago, IL
Bid Date: Dec 22 2022
West Chicago, IL
Bid Date: Mar 03 2022
West Chicago, IL
Bid Date: Dec 08 2021
West Chicago, IL
Bid Date: Mar 29 2022
West Chicago, IL
Bid Date: Apr 29 2022
West Chicago, IL
Bid Date: Dec 08 2022
West Chicago, IL
Bid Date: Sep 06 2022
West Chicago, IL
Bid Date: Apr 26 2022
West Chicago, IL
Bid Date: Nov 07 2022
West Chicago, IL
Bid Date: Nov 07 2022
West Chicago, IL
Bid Date: Sep 27 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.