Site work and renovation of a water / sewer project in El Paso, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Northeast Aquifer Storage and Recovery (ASR) Enhanced Arroyo Phase I will create linear basins by enhancing an arroyo which will replace the existing infiltration basins that El Paso Water currently uses to recharge the Hueco Bolson Aquifer. The Enhanced Arroyo shall receive highly treated wastewater from the Fred Hervey Water Reclamation Plant through construction of the proposed earthwork improvements which will allow infiltration of waters into the Hueco Bolson. The work covered under this project would provide a new inlet for the treated wastewater to infiltrate into the ground and recharge the local aquifer. The overall project consists of the following items: mobilization, demobilization, excavation, trench safety system, traffic control plan, 16-inch, 20-inch, and 24-inch PVC piping, gate valves (16-inch, 20-inch, and 24-inch) with bonnet box, HMAC paving for the parking lot and hike and bike trail, and walking trail, concrete header curb, concrete weir structures, rockwalls, retaining walls, Gabion baskets and mattresses, concrete driveways, maintenance road with rock screening, 8-inch injection pipe, 8-inch motor operated gate valves, flow meter, landscaping amenities (trees, boulders, bollards, irrigation system, benches, trash cans, etc.) motor operated valves (MOV), electrical and SCADA system integration. The project description, as shown above, is only a general overview of this project. The Contractor shall refer to the project plans and specifications for further information. The Northeast Aquifer Storage and Recovery (ASR) Enhanced Arroyo project costs are anticipated to range from $6 million to $7 Million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The bid will be awarded by the Public Service Board (PSB) at their regularly scheduled monthly meeting. For additional information, contact the Purchasing Department at (915) 594-5628. The work will be substantially complete within 330 calendar days after the Contractor has been notified to commence work.

Post-Bid

Water / Sewer

$7,000,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
8
Bidding Soon
255
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2022

May 5, 2022

img_map_placeholder

To Be Determined, El Paso, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.