Renovation of a water / sewer project in Williamstown, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

Requests for clarification are due Friday, March 25, 2022 12:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. The Work will include, but will not necessarily be limited to, providing all equipment, materials, labor, supervision, and testing services for the Water Treatment Plant Improvements project as further described in the Contract Documents. Clarification Deadline: 3/25/2022 12:00 PM Final questions are due no later than 12:00 p.m. March 25, 2022. A final addendum will be issued by 3:00 p.m. on March 28, 2022. Each proposal shall be accompanied by a Bid Bond in the required form, certified check, bank cashier's check, or other security acceptable, to the Owner in the amount of 10% of the total Base Bid. Bids will be effective for 60 calendar days from the Bid opening date except as permitted by law and may not be withdrawn during this period. Bidders must Bid on all items listed on the Bid Form. This Project is subject to the Davis Bacon Act conditions. This project is being federally funded by Dauphin County financial assistance dollars and therefore requires all contractors to demonstrate compliance with federal Executive Orders 11625, 12138., and 12432 and EPA Regulations at 40 CFR Part 33, through the detailed documentation of solicitation of Disadvantage Business Enterprises (DBEs). Contractors must demonstrate the Six Good Faith Efforts to identify and solicit DBE firms that are potential sources for any procurement action in the areas of project construction, equipment, services, and supplies by including state qualified small business, and minority and women owned business enterprises in the bidding process. The Bidders must submit documentary evidence of Section 3 business concerns who have been contacted and to whom commitments have been made. Documentation of such solicitation and commitments shall be submitted concurrently with the bid. Bidders must comply with all State antibid-rigging regulations pertaining to work associated with this project and will be required to submit an executed non-collusion affidavit with the bid. This Project is subject to the Federal Occupational Safety & Health Act of 1970 (OSHA) conditions. This Project is subject to Pennsylvania Act 287 of 1974, as amended by Act 172 of 1986, as amended by Act 38 of 1991, as amended by Act 187 of 1996. This project is subject to the Trade Practices Act of July 23, 1968, P.L. 686 (81 P.S. 773.101 et seq.) This Project is subject to the Public Works Employment Verification Act. This Contract is subject to Pennsylvania Human Relations Act 222 conditions. This Contract is subject to the non-discrimination in Employment/Contract Compliance Regulations Conditions. Williamstown Borough Authority reserves the right at its option to waive any informalities, irregularities, defects, errors or omissions in any or all of Bids and to accept or reject any or all .

Bid Results

Water / Sewer

$32,000.00

Public - City

Renovation

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Pest Control Devices
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
103
Bidding Soon
1,464
All Active Projects
643
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2022

May 13, 2022

img_map_placeholder

8693 US-209, Williamstown, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water Treatment Plant Filter Media Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.