BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Grand Chute, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The construction project includes the following: replacement of the existing roadway, removal of any shrubs within the right-of-way that will be in conflict with paving operation, storm sewer utility installation and storm sewer structure adjustments, sanitary sewer manhole adjustments, water main valve adjustments, reconstructing all side road intersections to match point, installing concrete curb & gutter, installation of concrete road pavement, and associated sidewalk / trail, driveway aprons and lawn restoration work. The proposed roadway will be converted from a temporary asphalt paved surface to the proposed finish concrete surface from the original Cherryvale Avenue Road design consisting of a proposed road 36-feet wide from face of curb to face of curb. The proposed roadway will be contained within the current 66-foot right-of-way for both sections. The proposed sidewalk will include a typical sidewalk section of 5-feet wide with 6 sidewalk ramps and the trail will a typical section matching the sidewalk 10-feet wide. Cherryvale Avenue - Beginning at the intersection of Cherryvale Avenue and W. Evergreen Drive and continues north approximately 4,225 feet on Cherryvale Avenue to Gladiolus Place. shall include 2,230 cubic yards of common excavation, 8,605 square yards of asphalt pulverizing, 9,590 square yards of 7" concrete pavement, 360 square yards of asphalt pavement, 30,895 square feet of sidewalk/driveway pavement, 4,660 square yards of site/turf restoration. Storm sewer utility work includes 370 lineal feet of 12-inch to 15-inch diameter storm sewer main and 7 storm inlets. Also included are some miscellaneous items and adjustments to the existing utilities. PN - 00941627

Bid Results

Roads / Highways

$854,170.00

Public - City

Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
16
Bidding Soon
348
All Active Projects
139
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 23, 2022

img_map_placeholder

Cherryvale Ave, Grand Chute, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.