Site work for a water / sewer project in Oakridge, Oregon. Completed plans call for site work for a water / sewer project.

Award Details Contract Award Date: Sep 27, 2022 Contract Award Number: W9127N-22-C-0021 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: NSVMMYFKEEB6 Contractor Awarded Name: Abhe & Svoboda, Inc. Contractor Awarded Address: Jordan, MN 55352-8323 USA Base and All Options Value (Total Contract Value): $3293300.00 1. General. This is a SOURCES SOUGHT and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION, OR BID, NOR A SYNOPSIS OF A PROPOSED ACTION UNDER FAR SUBPART 5.2. 2. Contract Information. The U.S. Army Corps of Engineers (USACE), Northwestern Division, Portland District (CENWP) has been tasked to replace the 3rd Tainter Gate at Hills Creek Dam. The magnitude of construction is between $1M and $5M. The purpose of this Sources Sought is to gain knowledge of the interest, capabilities, and qualifications of industry, to include: Large Business, Small Business, Small Disadvantaged Businesses to include 8(a) certified small business firms, Historically Underutilized Business Zone small business (HUBZone), Woman owned Small Business (WOSB), including Economically Disadvantaged Women-Owned Small Business (EDWOSB) and Service-Disabled Veteran-Owned Small Business (SDVOSB). All are highly encouraged to respond. 3. Capability Statements Contractors are requested to submit a statement demonstrating their ability to fabricate and install an new tainter gate at the Hills Creek Dam. Major elements of the project include: (1) Structural demolition, fabrication and installation of gate trunnion end frames, trunnion yokes, wire rope for the hoist system, rib stiffeners, lead-based paint abatement, painting, removal and replacement of seals and seal hardware, and machinery platform locating and installation. (2) Equipment demolition and replacement including brake-motors, gear reducers, line shaft bearings, parallel shaft reducers, couplings, limit switches, hoist drums, gate rollers, and gate operation testing. (3) Replacement of spillway power feeders from the intake tower to the new spillway distribution center, spillway power distribution, replacement of all (3) gate control cabinets, installation of local pendant control centers, installation of portable floodlight receptacles on the machinery platforms, installation of spillway receptacle stations, staff gauge light fixtures, and installation of portable generator receptacle for emergency backup spillway power 4. Project Background. Hills Creek Dam is located southeast of Eugene OR close to the town of Oakridge. The main purpose of the reservoir is to provide flood protection. The first two of the Tainter gates were replaced in 2019 and the third gate is the last gate to be replaced. The gates were replaced due to the dam safety issues with the existing Tainter gates. The U.S. Army Corps of Engineers (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This announcement is for Gate Replacement at Hills Creek Dam, located in Linn County, Oregon. PROJECT DESCRIPTIONS: Hills Creek Dam is located southeast of Eugene OR close to the town of Oakridge. The main purpose of the reservoir is to provide flood protection. The first two of the Tainter gates were replaced in 2019 and the third gate is the last gate to be replaced. Major elements of the project include demolition, fabrication and installation of gate trunnion end frames, trunnion yokes, rib stiffeners, trunnion bushing, trunnion keeper bar, trunnion pin, trunnion thrust washer, staff gauge, gate rollers, and other ancillary equipment, lead-based paint abatement, painting, removal and replacement of seals and seal hardware and associated work, gate operation testing. The construction start date for in-water work activities is expected to begin on 15 July 2023 and end on 15 October 2023 with a final construction physical completion date 540 days after Notice to Proceed. Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. This aquisition will result in a single firm-fixed-price contract. Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000. Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams. Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Clinton Jacobsen at Clinton.M.Jacobsen@usace.army.mil, SUBJECT: Hills Creek Tainter Gate Solicitation. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEBORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRE-SOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$3,293,300.00

Public - Federal

Site Work

176

17

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
15
Bidding Soon
298
All Active Projects
127
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2022

August 15, 2023

img_map_placeholder

To Be Determined, Oakridge, OR


Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.