BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Arthur, Ontario. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

For the reconstruction of Domville Street from Preston Street to Conestoga Street, Arthur in the Township of Wellington North. The contract involves removal of existing asphalt, soil excavation, granular base, hot mix asphalt, storm sewer, sanitary sewer, watermain, concrete sidewalk, concrete curb and gutter. Contract document may be obtained electronically through Triton Engineering Services Limited by emailing Teresa Hutchison at thutchison@tritoneng.on.ca.

Award

Roads / Highways

$1,985,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
386
Active Projects
194
Bidding Soon
4,147
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2022

June 13, 2022

Project location map

Domville St, Arthur, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.