EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 1, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a civil project in Cumming, Georgia. Completed plans call for site work for a water / sewer project.

Project Number- 22011 The City of Cumming hereby requests BIDS for furnishing all materials, labor, tools, equipment, and appurtenances necessary for the construction Any questions should be directed to Tiffany Barry in writing to tiffany@cecincga.com. The deadline for submission of questions will be Friday, March 25, 2022. Bid Bond, the City will accept a cashier's check, certified check, or cash deposit in an amount equal to at least 5% of the total contract amount. The Owner reserves the right to reject any or all Bids or to waive any informality in the bidding, to evaluate Bids, and to accept any Bid, which in his opinion, may be for his best interest. The successful Bidder for this Contract will be required to furnish a satisfactory Performance Bond and a Labor and Material Payment Bond, with a corporate surety approved by the OWNER and listed in the latest issue of U.S. Treasury Circular 570, each in the amount of 100% of the Bid The City of Cumming - 2022 PWPF Improvements - Phase 1 shall include the relocation of an 8" gravity sewer and a 48" storm sewer system, as well as the installation of new fencing, high service pump controllers, valves, and other work, as well as the furnishing of all materials, labor, equipment, and appurtenances necessary to complete the work. Work to be done under this Contract shall include the furnishing of all materials, equipment, labor and means of construction necessary for the construction of the City of Cumming - 2022 PWPF Improvements - Phase 1 and all other work as shown on the Contract Drawings and/or as specified herein including. B. Work shall include clean-up and dress-up and all repair work necessary to restore pavement,lawns, and finished areas as closely as possible to their original condition following installation of the work. C. All work pertaining to any r equirements contained herein shall be included in the overall bid submitted unless such cost is designated as a separate pay item in the Bid Schedule. D. Contractor shall be responsible for obtaining and paying for all necessary local and state licenses, permits and taxes. E. The Contractor will be required to deliver all equipment, pipe, valves, and other materials to the location of installation. Care shall be exercised in handling all materials and equipment, and the Contractor will be held responsible for all breakage or damage to same.

Award

Water / Sewer

$4,913,950.00

Public - City

Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Plastic Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
103
Bidding Soon
1,643
All Active Projects
703
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2022

June 6, 2022

img_map_placeholder

935 Dahlonega Hwy, Cumming, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.