BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in San Bernardino, California. Contact the soliciting agency for additional information.

Response Format Electronic Project Type RFP (Request for Proposal) Response Types Response File Type of Award Lump Sum Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Online Q&A No San Bernardino County Transportation Authority ("SBCTA") is seeking professional services for the Design Engineering Evaluation Report (DEER)/Environmental Document (ED), Plans, Specifications and Estimate (PS&E), Right-of-Way (ROW), and Construction Support for the State Route (SR) 210/Waterman Avenue (SR 18) Interchange Project ("Project") in the City of San Bernardino. SBCTA Sales Tax Measure I Funds, and City Funds may be used to cover the cost of the preparation of the DEER/ED, PS&E, ROW, and Construction phase. The Project is located along SR 210 at Postmile 24.22, approximately 2.3 miles east of the SR 210/Interstate 215 Interchange. This Project will improve traffic operations and local circulation at the SR 210/Waterman Avenue intersection with East 30th Street and the eastbound SR 210 entrance ramp. The eastbound on-ramp will be widened to two lanes and the one southbound and northbound through lane will be converted into left-turn lanes. The proposed Project is consistent with the Circulation Element of the City of San Bernardino General Plan and would accommodate projected traffic volume through 2050. This will be a phased Project where the California Department of Transportation (Caltrans) will be providing improvements to the westbound off-ramp in a separate project. The Method of Contractor Selection has not been determined at this time.

Conceptual

Roads / Highways

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
98
Bidding Soon
2,194
All Active Projects
987
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2022

img_map_placeholder

S Waterman Ave, San Bernardino, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.