Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 12, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Evansville, Wisconsin. Completed plans call for site work for a water / sewer project.

The proposed work consists of concrete surface preparation and repair, removal of a gabion wall, installation of a concrete retaining wall, erosion control, and any incidental items necessary to complete the work. The City will be hosting a 4th of July event at Lake Leota Park. The City would like bid prices for the following two scenarios: Base Bid - Work begins approximately April 15, 2022 and is completed by July 1, 2022. All equipment and materials must be removed from the site, and final restoration shall be completed by July 1, 2022. Alternate 1 - Work begins no sooner than July 11, 2022.

Bid Results

Water / Sewer

$273,210.00

Public - City

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
170
Bidding Soon
3,517
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2022

April 15, 2022

Project location map

Multiple Locations, Evansville, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed