Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Manitowoc, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Project Category Code: Concrete Pavement, Paving - Concrete, Street/Road Concrete Reconstruction, Paving (Asphalt or Concrete) Description: This Contract consists of three different types of concrete paving projects as follows: 1) Partial Reconstruction and Complete Reconstruction of Kellner Street from Fleetwood Drive to Menasha Avenue. 2) Complete Reconstruction of Fleetwood Drive from North Rapids Road to 629 feet East of Kellner Street. 3) Concrete Pavement Replacement coinciding with upsizing the storm sewer on the westerly part of the cul-de-sac on Andrea Court. The partial reconstruction and complete reconstruction work on Kellner Street includes pavement removal, grading, graveling, fine grading, concrete pavement with some integral curb, concrete curb & gutter replacement, clean & seal existing pavement joints, concrete driveway and concrete sidewalk replacement. The project also includes replacing some storm sewer structures, relaying a sanitary lateral and replacement of "MJ" bolts on some of the existing watermain. The project also includes lawn restoration and pavement markings. The complete reconstruction work on Fleetwood Drive includes pavement removal, grading, graveling, fine grading, concrete pavement with all integral curb, concrete driveway and concrete sidewalk replacement. The project also includes relaying some storm sewer and reconstructing a sanitary manhole. The project also includes lawn restoration work. This project has Wisconsin Department of Transportation (WISDOT) Local Road Improvement Program (LRIP) MSIGT Funding for the reconstruction of Fleetwood Drive from Kellner Street to 629 feet East of Kellner Street. It is the intent of the City to require the Contractor to reconstruct Kellner Street one-half at a time. The Contractor shall be required to fully complete all work on the first side before any work on the second side/half can commence. The Contractor shall provide continuous traffic at all times on new or existing concrete pavement. There is an Add-Alternate Bid for the reconstruction of the western one-half ( 1/2 ) of Fleetwood Drive, which is from North Rapids Road to 50 feet west of the centerline of Kellner Street. The Add-Alternate shall not be included in the total cost of the Base Bid. The City shall determine the low bidder on the basis of the Base Bid Only. It is anticipated that the City will Award the Add-Alternate work if there are sufficient City funds available to complete the additional work.
Bid Results
Roads / Highways
$1,219,556.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 23, 2022
April 22, 2022
Multiple Locations, Manitowoc, WI
Related To This Project
Manitowoc, WI
Bid Date: Apr 06 2022
Manitowoc, WI
Bid Date: Apr 06 2022
Manitowoc, WI
Bid Date: Apr 06 2022
Manitowoc, WI
Bid Date: May 04 2022
Manitowoc, WI
Bid Date: Apr 20 2022
Manitowoc, WI
Bid Date: Apr 20 2022
Manitowoc, WI
Bid Date: May 04 2022
Manitowoc, WI
Bid Date: Apr 13 2022
Manitowoc, WI
Bid Date: Apr 14 2022
Manitowoc, WI
--
Manitowoc, WI
--
Manitowoc, WI
Bid Date: Nov 30 2022
Manitowoc, WI
Bid Date: Oct 23 2018
Manitowoc, WI
--
Manitowoc, WI
Bid Date: Dec 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.