BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Charleston, Illinois. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project is located approximately 2.75 miles north of Rardin. Proposed improvement includes: removal and replacement of existing bridge deck, guardrail removal, steel railing, traffic control and other work listed in the plans. The right is reserved to waive technicalities and to reject any or all proposals. 4. All Contracts for the Construction of Publics Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12).

Post-Bid

Bridges / Tunnels

$280,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
58
Bidding Soon
795
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2022

April 22, 2022

Project location map

2nd St, Charleston, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.