BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Golconda, Illinois. Completed plans call for site work for a road / highway; and playground / park / athletic field.

Contract Award Date: Jun 03, 2022 Contract Award Number: 12445522C0008 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: BH ELECTRIC LLC Contractor Awarded Address: Marion, IL 62959 USA Base and All Options Value (Total Contract Value): $289050.52 This project consists of providing all labor, equipment, tools and materials to replace the 7200 V main underground transmission electrical lines, connections and inspect all transformers within the Lake Glendale Recreation Area on the Shawnee National Forest. From Harrisburg, IL - Take Highway 145 south 26.5 miles. Turn left into the recreation area off of Hwy 145. A pre-bid meeting will be held on Friday, March 11, 2022 @ 10:00 a.m. CST Location: Entrance of Oak Point Campground Lake Glendale Recreation Area Lake Drive Golconda, Illinois Contractor must be registered at www.sam.gov to be considered. THIS IS A FREE REGISTRATION. b. There will be a pre-bid meeting for this project. See page 40 for details. c. There is a requirement to submit a technical proposal with your offer. See Section L &M for preparation instructions. d. Award will be made to one contractor. You must submit pricing for all items, including any option items and/or option years. e. This is a construction project which has the following bonding requirements: - 20% bid bond for offers over $150,000 required with offer submission. - 100% performance and payment bonds for offers over $150,000 upon award. - See Section I for details. - Proper bonding forms must be utilized. SF24, SF25 & SF25A forms can be accessed at https://www.gsa.gov/reference/forms f. Due to mail/delivery limitations as a result of the COVID-19 pandemic, bid guarantees must be submitted electronically via email with quotes. NO FAXES OR HARDCOPIES WILL BE ACCEPTED. SCOPE OF CONTRACT This project consists of providing all labor, equipment, tools and materials to replace the 7200 V main underground transmission electrical lines, connections and inspect all transformers within the Lake Glendale Recreation Area on the Shawnee National Forest. C.2 PROJECT LOCATON From Harrisburg, IL - Take Highway 145 south 26.5 miles. Turn left into the recreation area off of Hwy 145. C.3 MAGNITUDE OF CONSTRUCTION PROJECT The Government's estimate is between $100,000 and $250,000 C.4 TECHNICAL SPECIFICATIONS SECTION 260001 - BASIC ELECTRICAL REQUIREMENTS Part 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. Provide the following: All labor, equipment, tools and materials to replace the 7200 V main underground transmission electrical lines, connections and inspect all transformers within the Lake Glendale Recreation Area. B. Contractor shall coordinate as with Southeastern Illinois Electric Cooperative for connection with the meter and any associated transformers. C. All work shall be done in accordance with the National Electrical Code, National Electric Safety Code and any superseding state or local code. CURRENT SITE CONDITIONS A. Currently the site is supplied electricity from a meter located within the southwestern portion of the recreation area. Access to the area is a dirt road from state highway 145 south of the main recreation are entrance. B. The recreation site shall remain open. Contractor shall coordinate with concessionaire for temporary closure of the facilities as needed. C. The main transmission line is an underground 7200 V line that was installed in 1968. D. Replacement shall begin at the main meter. Approximate length from the meter on the pole to Duck Bay Picnic Area transformer is 5,840 LF.E. Approximate length from the main transmission line to Oak Point transformer and to Goose Bay Picnic Area transformer is 1,700 LF. F. Five existing transformers with distribution panels shall be inspected and notify COR of any issues associated with them that might affect their performance. G. Contractor shall verify all quantities. H. Contractor shall locate all other utilities within the new line installation area. Part 2 - PRODUCTS 2.1 GOVERNMENT FURNISHED MATERIALS A. Site plans of the recreation area with approximate utilities locations. B. Information on existing transformers and panels. C. Government shall make available all drawings for improvements at the site involving all resent utility work. CONTRACTOR FURNISHED MATERIALS A. Commercially available Underground High Voltage Transmission cable, minimal 7200 V B. All necessary conduit, connectors, splicers, and other items recommended by manufacture. C. Underground-Type plastic line marker shall be a standard permanent, bright-colored, continuous printed plastic tape intended for electric line buried cable and installed to standard. D. Grounding material and installation drawing. E. Drawing showing the location of proposed new line installation. F. Contractor shall submit 3 copies of data information for all proposed furnished materials for approval to the COR prior to installation. G. The COR shall inform contractor of approval or rejection of each item with in 14 days of receiving submissions and return a copy to the contractor. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$289,050.00

Public - Federal

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
24
Bidding Soon
404
All Active Projects
167
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2022

April 18, 2022

img_map_placeholder

To Be Determined, Golconda, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.