BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Visalia, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of May 5, 2022, project was awarded to Cal Valley Construction, awarded amount is $4,330,007.60. Direct questions to Grey Tompkins, Engineer IV, GTompkins@tularecounty.ca.gov, (559) 624-7194. Questions will not be accepted if received after 5:00 pm Wednesday March 24, 2022 The work to be done consists, in general, of a combination of isolated pavement repairs followed by the installation of new asphalt surfacing. Other items or details not mentioned herein that are required by the plans, Standard Specifications or these Special Provisions must be performed, constructed, furnished or installed. This project is off of the Federal Highway System. This project is a Non-Federal Aid project with an estimated project cost of approximately $4,800,000. The contract will be awarded to the responsible bidder submitting the lowest priced responsive bid. The Project is to be completed within sixty (60) working days from the date to be established in the NOTICE TO PROCEED. The Contract includes provisions for Liquidated Damages if the Project is not timely completed. Technical questions should be directed in writing to Grey Tompkins at the Resource Management Agency, 5961 S. Mooney Blvd, Visalia CA 93277 or at gtompkins@tularecounty.ca.gov . No questions will be accepted within five (5) working days of the bid opening (Questions must be received by 5:00 pm on Wednesday March 24, 2021). All questions and responses will be continuously posted on the County. The successful bidder must provide the performance bond, payment bond, workers compensation certificate, and liability insurance policy required by the Special Provisions and contract. Two Million dollars ($2,000,000) liability coverage is required for this project. The Board of Supervisors reserves the right to reject any or all bids, and/or waive any informality in any bid, and/or determine in its discretion the responsibility of any bidder. The Board of Supervisors further reserves the right to use County Forces, or to negotiate contracts, or both, to the extent authorized by the Public Contract Code.

Award

Roads / Highways

$4,330,008.00

Public - County

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
27
Bidding Soon
420
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2022

June 15, 2022

img_map_placeholder

Multiple Locations, Visalia, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.