BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Gainesville, Georgia. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of August 23, 2024 bids for this project has no bids received. of this time it is unknown if and when project will rebid. This project includes furnishing of all materials, equipment, labor and means of construction necessary for the construction of the Dove Point Pump Station, 20-inch gravity sewer installation, fire station wet well conversion to a receiving manhole, Reunion pump station abandonment including site and yard piping modifications, modifications to the Mulberry Creek pump station including the installation of a vertical screen, removal of pumps with motors and installation of new dry pit submersible pumps, installation of a compressed air mixing system and spray water system in the wet well and installation of a new 16-inch HDPE and DIP force main and demolition of the surge tank along with site work. Modifications to the Crystal Farms pump station include installation of an insertion valve, construction of two (2) new valve vaults with interconnecting 12-inch DIP force main, new valve vault at HWY 53 and Howington Road. All work includes new electrical, and instrumentation as shown on the plans and specified. B. Work shall include clean-up and dress-up and all repair work necessary to restore pavement, lawns, and finished areas as closely as possible to their original condition following installation of the work. C. All work pertaining to any requirements contained herein shall be included in the overall proposal submitted unless such cost is designated as a separate pay item in the Bid Schedule. D. Contractor shall be responsible for obtaining and paying for all necessary local and state licenses, permits and taxes. E. The Contractor will be required to deliver all equipment, pipe, valves, and other materials to the location of installation. Care shall be exercised in handling all materials and equipment, and the Contractor will be held responsible for all breakage or damage to same. F. Reunion pump station shall remain in service until the proposed Dove Point pump station is commissioned. The Mulberry Creek pump station shall remain in service at all times during modifications. To accomplish this will require the use of temporary pumping and piping at the Contractor cost. G. Hall County will salvage pumps and valve equipment removed from the Reunion and Mulberry Creek pump stations. Contractor to remove the salvageable equipment, transfer to the Spout Springs WRF and off load for storage. Bidders Questions Due: Friday, July 19, 2024, by 4:00 pm Answers to Questions Due: Friday, July 26, 2024 Contractor Questions: All questions pertaining to the Project and Bid Documents must be submitted electronically. Questions must be submitted by Friday, July 19, 2024, by 4:00 pm. All Contractor questions should be made in writing to David Gauker at david@cecincga.com. A satisfactory Bid Bond (in the amount of 5% of the Bid), executed by the Bidder, and an acceptable surety company listed in the latest issue of U.S. Treasury Circular 570, will accompany each BID. The Owner reserves the right to reject any or all Bids or to waive any informality in the bidding, to evaluate Bids, and to accept any Bid, which in his opinion, may be in his best interest. The successful Bidder for this Contract will be required to furnish a satisfactory Performance Bond and a Labor and Material Payment Bond, with a corporate surety licensed to do business in the State of Georgia with a rating of not less than A- and approved by the OWNER and listed in the latest issue of U.S. Treasury Circular 570, each in the amount of 100% of any awarded contract. Performance and Payment Bonds are NOT required to bid, but will be required after award

Final Planning

Water / Sewer

$7,289,190.00

Public - County

Renovation, Site Work

100

23

17

10

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
338
Active Projects
175
Bidding Soon
2,181
All Active Projects
998
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 8, 2024

December 25, 2024

March 31, 2026

img_map_placeholder

Multiple Locations, Gainesville, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.