Demolition and site work for a power facility in Del Norte, Colorado. Completed plans call for the demolition of a power facility; and for site work for a power facility.

SMSS CDP DEMOLITION Date Email Questions Due 04/18/2022 @ 3:00 PM Date Email Answers Issued 04/13/2022 Anticipated Construction Start 05/09/2022 Anticipated Construction Finish No Later Than 07/24/2022 The Colorado Department of Public Health and Environment (CDPHE) is seeking a Contractor to perform demolition of the former Cyanide Destruction Plant (CDP) at the Summitville Mine Superfund Site (SMSS), located approximately 25 miles south of Del Norte, Colorado The CDP is a pre-engineered, two-story metal building built in 1985 for cyanide destruction processing, storage, and office space. It is approximately 275 feet long (east-west) and 60 feet wide (north-south), located about 2,000 feet southeast of the active Water Treatment Facility. The demolition will include the building structure, equipment, infrastructure, concrete pads, curbs, and equipment pedestals down to the top of the 6-inch floor slab, which will remain. The complete demolition of the superstructure will also leave a concrete wall, about 2-feet 10-inches high, at the perimeter of the former building.

Award

Power Plant

$500,000.00

Public - State/Provincial

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
3
Bidding Soon
77
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2022

May 9, 2022

Project location map

To Be Determined, Del Norte, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.