Demolition and site work for a power facility in Del Norte, Colorado. Completed plans call for the demolition of a power facility; and for site work for a power facility.
SMSS CDP DEMOLITION Date Email Questions Due 04/18/2022 @ 3:00 PM Date Email Answers Issued 04/13/2022 Anticipated Construction Start 05/09/2022 Anticipated Construction Finish No Later Than 07/24/2022 The Colorado Department of Public Health and Environment (CDPHE) is seeking a Contractor to perform demolition of the former Cyanide Destruction Plant (CDP) at the Summitville Mine Superfund Site (SMSS), located approximately 25 miles south of Del Norte, Colorado The CDP is a pre-engineered, two-story metal building built in 1985 for cyanide destruction processing, storage, and office space. It is approximately 275 feet long (east-west) and 60 feet wide (north-south), located about 2,000 feet southeast of the active Water Treatment Facility. The demolition will include the building structure, equipment, infrastructure, concrete pads, curbs, and equipment pedestals down to the top of the 6-inch floor slab, which will remain. The complete demolition of the superstructure will also leave a concrete wall, about 2-feet 10-inches high, at the perimeter of the former building.
Award
Power Plant
$500,000.00
Public - State/Provincial
Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 19, 2022
May 9, 2022
To Be Determined, Del Norte, CO
Related To This Project
Del Norte, CO
Bid Date: Aug 16 2022
Del Norte, CO
Bid Date: Dec 09 2021
Del Norte, CO
Bid Date: May 12 2023
Del Norte, CO
Bid Date: Aug 21 2023
Del Norte, CO
Bid Date: Aug 16 2023
Del Norte, CO
Bid Date: Sep 18 2023
Del Norte, CO
Bid Date: Oct 18 2018
Del Norte, CO
Bid Date: Nov 03 2023
Del Norte, CO
Bid Date: Jan 16 2023
Aurora, CO
Bid Date: Mar 07 2022
Grand Junction, CO
Bid Date: May 18 2022
Durango, CO
--
Brighton, CO
Bid Date: Jan 28 2022
Oak Creek, CO
Bid Date: Apr 21 2022
Edwards, CO
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.