BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cameron, Texas. Completed plans call for site work for a water / sewer project.

Water Line from Batte Street to W. 4th Street. The work to be performed under this contract consists of furnishing all materials, labor, supervision, tools, equipment and incidentals required, and performing all work necessary for installation of the following: - 6 inch PVC Waterlines- 2350 LF - 6 inch Gate Valves by Open Cut-7 - 8 inch Gate Valves by Hot Tap-2 - Steel Encased Pipe-40 LF - Fire Hydrants -4 - Removal & Replacement of Existing Fire Hydrant-1 - Replace and Reconnect Existing Meters-14 - Reconnect Existing Service Lines-1 - Removal & Replacement of Asphalt Roadway-1100 SY Furnish all labor and materials and perform all work for the construction of the following described project: Water Distribution Improvements - Phase IV Cameron, Texas Bids must be submitted on the Bid Form provided and must be accompanied by a cashier's check, certified check or acceptable bidder's bond payable without recourse to the City of Cameron, Texas in an amount not less than five (5) percent of the bid submitted as a guarantee that the bidder will enter into a contract and execute a Performance Bond and a Payment Bond within ten (10) days after the notification of the award of the contract. The notice of award of contract will be given by the owner within ninety (90) days following the opening of bids. Bidders shall be required to hold bids for at least 90 days after bid opening. Any contract or contracts awarded under this Invitation for Bid (IFB) or Request for Qualifications (RFQ) are expected to be funded in part by financial assistance from the Texas Water Development Board, and shall be referred to as Project (DWSRF No. 62695). Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees, are or will be a party to this IFB, RFQ, or any resulting contract. This project is subject to the American Iron and Steel (AIS) requirements of 33 U.S.C 1388 for Clean Water State Revolving Fund projects or Public Law 114-113, Consolidated Appropriations Act, 2016, or subsequent appropriations acts, for Drinking Water State Revolving Fund projects. Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of these laws. This contract is subject to the EPA's "fair share policy", which includes EPA-approved "fair share goals" for Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) firms in the Construction, Supplies, Equipment, and Services procurement categories. EPA's policy requires that applicants and prime Contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to Minority Business Enterprise and Women-Owned Business Enterprise firms. Although EPA's policy does not mandate that the fair share goals be achieved, it does require applicants and prime Contractors to demonstrate use of the six affirmative steps. The current fair share goals for the State of Texas are as follows: All qualified Applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors--Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order No. 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial Q&A End date 12pm on Friday, March 25, 2022 This specification coversthe requirementsto plan, design, construct, install, maintain, monitor, modify as necessary, and remove upon completion, a Trench Safety System as specified herein. B. The requirements of this Section apply to all trenches which equal or exceed a depth of five (5) feet, measured from the ground surface at the highest side of the trench to the trench bottom

Bid Results

Water / Sewer

$410,875.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
43
Bidding Soon
1,944
All Active Projects
737
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2022

August 8, 2022

img_map_placeholder

S Colfax Ave, Cameron, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.