Renovation of an educational facility in Lagrange, Georgia. Completed plans call for the renovation of a educational facility.

No bid may be withdrawn for a period of thirty (30) days after bids are opened. Bid bond in the amount of five percent of the base bid is required and must be submitted with the bid. A bid bond is the only acceptable form of bid security. No personal checks, cashiers checks, certified checks or cash will be accepted in lieu of the bid bond. Performance and payment bonds in the amount of one-hundred percent (100%) of the contract sum will be required prior to commencement of construction. All bonds shall be written by a surety licensed to conduct business in Georgia, listed on the Federal Register and acceptable to the Owner. Bidder shall attach a Contractor Affidavit and Agreement demonstrating compliance with O.C.G.A. 13-10-91, Georgia Security and Immigration Compliance Act. Bidder shall also comply with provisions of O.C.G.A. 5036-1, Verification of Lawful Presence Within United States through the use of the Systematic Alien Verification for Entitlements (SAVE) program and shall provide verification of compliance with executed affidavits which are available on the Georgia audits and Accounts website Owner reserves the right to waive technicalities and irregularities and to reject any or all bids. Removal and replacement of the hardwood maple athletic flooring in the Aux gymnasium. The existing floor is a direct glued maple parquet floor with no subfloor measuring 11,715 total square feet. (Contractor is responsible to verify square feet) The floor is glued directly to the concrete. Approximately 2800 square feet at the north end of the gymnasium has rotted due to chronic moisture. The glue has failed throughout this area and the floor is discolored in areas that are compromised. There is also evidence of other slightly discolored along the expansion joints in the concrete substrate. The discoloration that appears on the parquet is an indicator of long term chronic moisture damage. Because the existing floor is wood glued directly to concrete, the floor is extremely susceptible to changes in moisture in the concrete. This change can be attributed to failed moisture prevention under the slab. Based on the above information, we believe the moisture is coming up from the slab rather than an incursion of water into the building from the roof or from the walls. Replace floor with a fixed resilient sleeper system that will incorporate a 10 mil moisture barrier and provide a forced air solution to inhibit future moisture issues. Once the existing parquet floor has been removed, the concrete slab must be inspected for evidence of moisture source. Contractor must apply an elastomeric filler for any excessive cracks that may be found. Install a new fixed resilient ,wood sleeper and subfloor consisting generally of 12mm resilient pads, 1" engineered plywood sleeper, one layer of 15/32" thick, 4'x 8' CDX rated sheathing and steel anchors installed over 10 mil polyethylene moisture barrier. MFMA approved 25/32" x 2 1/4 ", 2nd & better grade northern hard maple nailed approximately 16" on center. After proper installation, Sand floor smooth using coarse, medium and fine sandpaper, then rotary sanded or "screened" to remove all drum sander marks. Then seal floor with two coats of Bona DTS, in preparation for the painting game lines, lettering, and logos similar to existing, using Bona SuperSport game lines paint. Following the painting, Three coats of Bona SuperSport water based gym floor finish applied to the entire court surface After the finishing of the floor install 4"x 3" black vent cove base at the perimeter of the gymnasium floor. Heavy rubber ADA ramps installed at the two exterior entrances, five interior halls and four single door exits. During this installation process detach, move & reattach the existing bleacher system as well as raise the goals as needed. Provide and install six new flush mounted volleyball plates. Install a flush mounted air flow system under the bleachers on one side of the floor to force ambient air under the new floor system.

Award

Educational

$229,800.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
82
Bidding Soon
1,334
All Active Projects
549
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2022

May 9, 2022

img_map_placeholder

1920 Hamilton Rd, Lagrange, GA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.