BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in Denver, Colorado. Completed plans call for the renovation of a educational facility.

Estimated Construction Cost: $700,000 FLCC Phase 1 and $1,300,000 FLCC Phase 2 The purpose of the project is to replace aging equipment and improve reliability to the emergency chilled water system that serves critical spaces in the Fitzsimons (Q20 - Fitz) building and Vivarium Air Handling Units in Research 1 (P18 R1), Research 2 (P15 R2), and the new Anschutz Health Sciences Building (P12 - AHSB) for the University of Colorado Denver | Anschutz Medical Campus (CU-Denver | AMC). The project will be broken into two (2) phases. Phase 1 is devoted to preparation, including piping distribution modifications, that will allow the distribution to be looped and provide circulation reliability without trigging emergency transfer. Phase 2 is devoted to the replacement of the existing emergency chiller plants chillers located in the Fitzsimons building. The successful CM/GC firm will be expected to provide services for Phase 1 and Phase. The anticipated FLCC is $700,000 for phase 1 and $1,300,000 for phase 2. Refer to the included Appendix G for the schematic design set and scope included in each phase. The current project scope, schedule, and phasing plan is based on approval of state funding for phase 2 that would be available beginning in July of 2022. In the event phase 2 is not funded this project may be cancelled, delayed, or altered including the work currently funded in Phase 1. A funding decision for Phase 2 is expected by end of May 2022. The shortlisted firms should provide a cost proposal based on the total of Phase 1 and 2 combined. The University of Colorado Anschutz Medical Campus anticipates using a Construction Manager/General Contractor (CM/GC) approach to project delivery. A Guaranteed Maximum Price (GMP) and an updated project duration schedule will be established by the Architect/Engineer and the Construction Manager/General Contractor in conjunction with the University of Colorado Anschutz Medical Campus. The CM/GC will evaluate, among other things, availability of materials and labor, project schedule, project costs as they relate to the established budget, constructability, and will work closely with the Architect/Engineer and the University of Colorado Anschutz Medical Campus throughout the planning, design and construction phases of the project. Construction is estimated to commence University of Colorado Anschutz Medical Campus. The process to be used in the selection of the CM/GC is comprised of two steps. STEP I is the Submittal of Prequalification as described in Section II (D). STEP II is the Oral Interview/Cost Proposal as described in detail in Section III. A Jury Panel of individuals who will be involved in the project and/or understand the required services associated with Construction Management/General Contracting will evaluate responses to this RFP for both STEPS. Upon completion of the evaluation of the Submittals of Prequalification, a limited number of firms will be invited to the oral interviews. Sealed fee proposals will be required only from those firms who are interviewed and are to be submitted as indicated in this RFP. Both qualifications and cost will be considered in the final ranking of firms with qualifications given 70% of the value of the weighted criteria and fees for the Cost/ Proposal given 30%. Date Email Questions Due March 22, 2022 by 2PM Date Email Answers Issued March 25, 2022 Interview Short List Announced April 6, 2022 Sealed Proposal Due (Evaluation and Award: Step II) April 14, 2022 by 8AM Oral Interviews (In-Person) April 14, 2022 Selection Announced April 15, 2022 Negotiation of CM/GC Contract April 20, 2022 Contract Approval (projected) April 29, 2022 Anticipated Design Start Done

Post-Bid

Educational

$2,000,000.00

Public - State/Provincial

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
56
Bidding Soon
1,004
All Active Projects
414
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.