EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 24, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a road / highway in Wheaton, Illinois. Completed plans call for site work for a road / highway.

Pavement Maintenance, Including Hma Surface Removal 2-1/4" - 133,837 Sq Yd; Hma Surface Removal 2-1/2" - 54,994 Sq Yd; Polymerized Level Binder (Machine Method) Il-4.75 - 8144 Ton; Hma Surface Course, Mix "D",n70 - 11,543 Ton; Poly Hma Surface Course, Mix "E",n70 - 5534 Ton; Longitudinal Joint Sealant - 73,266 Foot; Pcc Sidewalk Removal - 8381 Sq Ft; Pcc Sidewalk - 5" - 10,458 Sq Ft; Combination Concrete Curb & Gutter Remove and Replacement - 10,472 Foot; Detectable Warnings - 1204 Sq Ft; Pavement Patching Class D 1888 Sq Yd; Drain Str Adj - 212 Ea; Fr&l Adj, Spl - 94 Ea; Inlet Ty. A - 6 Ea; Ss Cl. A Ty. 1 Rcp 15"- 44 Foot; Thermoplastic Pavement Marking - Line 4" - 95,697 Foot; Recessed Reflective Pavement Marker - 2732 Each; Detector Loop Replacement - 7669 Foot; Maint Exist Traffic Sig - 9 Ea; Handhole Adj - 4 Ea; Relocate Exist Ped Button - 12 Ea; Ped Sig Post, 5 Ft - 1 Ea; Ped Sig Head, Count Down - 1 Ea, Modify Exist Controller - 1 Ea; Traffic Control and Protection - 1 Lump Sum. Project Location: South; Yackley Avenue, 55th Street, Hobson Road Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Pavement Maintenance - 22-PVMTC-18-GM

Post-Bid

Roads / Highways

$200,000.00

Public - County

Site Work

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
161
Bidding Soon
2,162
All Active Projects
1,088
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

April 28, 2022

img_map_placeholder

Multiple Locations, Wheaton, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pavement Maintenance

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.