BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Morton Grove, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

City/County : Morton Grove Project Location: Various locations within the Village of Morton Grove Farrell road 1,100 feet south of oak avenue to the north terminus. 151st routine maintenance and emergency repairs of traffic control signals and street lights: maint. Street light equip., 4,044 unit-month; maint. Traf. Control signal equip. 48 unit-month; maint. Flashing traf. Control signal equip. 12 unit-month; detector loop type I 200 lin. Ft.; and remove & replace lighting unit 2 each from farrell road to gougar road. Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the department of transportation. Prequalification forms may be secured from the engineer of construction, administration building, 2300 south dirksen parkway, springfield, IL 62764. All bidders are hereby notified that any proposal requiring work to be performed by a contractor requires the prime and subcontrators to participate in an approved training program UNLESS FEDERAL FUNDS are involved. All bidders must complete BLR12325 (if required) and return with the bidders' proposals. If BLR12325 is not completed, the bid will not be read. ILDOT - Routine Maintenance and Emergency Repairs of Traffic Control Signals and Street Lights - 22-00000-00-GM

Award

Roads / Highways

$33,635.00

Public - City

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
99
Bidding Soon
1,946
All Active Projects
843
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2022

May 2, 2022

img_map_placeholder

Multiple Locations, Morton Grove, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.