BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Arlington Heights, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project will include but not limited to: Hot-mix asphalt (HMA) pavement removal, HMA surface and binder courses, sidewalk removal and replacement, concrete curb removal and installation, storm sewer improvements, fence removal and installation, stairs and railings improvements, site lighting improvements, Alternate #1 includes an underground StormTrap Vault, restoration and other items needed to complete the proposed improvements. This project is to be bid as a lump sum contract with supplemental unit prices. Not less than the prevailing rate of wages as found by the Department of Labor or determined by a court on review shall be paid to all laborers, workers and mechanics performing work under this contract. Certified payroll documentation of general contractor's and all sub-contractors' laborers will be required Bid security in the form of a Bid Bond or Certified Check for ten percent (10%) of the base bid made payable to the Township High School District 214 shall accompany the bid. The Contractor shall begin the work to be performed under the contract after Wednesday, June 1, 2022. The Contractor shall be substantially complete by Friday, July 29, 2022 and final completion by Friday, August 5, 2022. Freshman orientation is the week of August 8th, teachers return Thursday August 11th and school starts August 15th. Note: If Alternate #1 is awarded, construction schedule for Alternate #1 shall be June 2023 through July 2023. Substantial Completion is defined as all improvements except restoration. Final completion is defined as restoration and punch list items. In case of failure to complete the work on time, liquidated damages shall be assessed in accordance with the General Conditions of the Contract for Construction shall apply. The Owner reserves the right to reject any and all bids and bidders and to waive technicalities. LOCATION OF THE WORK Buffalo Grove High School and Rolling Meadows High School under School District 214 authority within Village of Buffalo Grove and City of Rolling Meadows found in Cook County Project will include but not limited to: Hot-mix asphalt (HMA) pavement removal, HMA surface and binder courses, sidewalk removal and replacement, concrete curb removal and installation, storm sewer improvements, fence removal and installation, stairs and railings improvements, site lighting improvements, Alternate #1 includes an underground StormTrap Vault, restoration and other items needed to complete the proposed improvements. This project is to be bid as a lump sum contract with supplemental unit prices.

Bid Results

Roads / Highways

$1,138,000.00

Public - City

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
127
Bidding Soon
2,130
All Active Projects
938
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

June 1, 2022

img_map_placeholder

Multiple Locations, Arlington Heights, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.