Site work and paving for a mixed-use development in Elk Grove Village, Illinois. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project will include but not limited to: Hot-mix asphalt (HMA) pavement removal, cold in-place pulverizing, HMA surface and binder courses, sidewalk removal and replacement, concrete curb installation, storm sewer improvements, fence removal and installation, tennis color coat, restoration and other items needed to complete the proposed improvements. This project is to be bid as a lump sum contract with supplemental unit prices. Bid security in the form of a Bid Bond or Certified Check for ten percent (10%) of the base bid made payable to the Township High School District 214 shall accompany the bid. The Contractor shall begin the work to be performed under the contract after Wednesday, June 1, 2022. The Contractor shall be substantially complete by Friday, July 29, 2022 and final completion by Friday, August 5, 2022. Freshman orientation is the week of August 8th, teachers return Thursday August 11th and school starts August 15th. Substantial Completion is defined as all improvements except restoration. Final completion is defined as restoration and punch list items. In case of failure to complete the work on time, liquidated damages shall be assessed in accordance with the General Conditions of the Contract for Construction shall apply. All bidders will submit along with their respective bid documents, a resume of similar projects performed, enumerated as to location, type of work, approximate completion date, and project engineering firm. Additionally, all bidders will submit a list of equipment owned by, or available to them, for the efficient pursuance of the project. All bidders will submit along with their respective bid documents, a satisfactory progress schedule or critical path schedule which shall show the proposed sequence of work, and how the Contractor proposes to complete the various items of work on or before the completion date specified. Contractor shall work around the individual summer school schedules provided on the plans and listed in the special provisions. Failure to provide a satisfactory progress schedule in the bid package will, at the discretion of the District, be disqualified. Not less than the prevailing rate of wages as found by the Department of Labor or determined by a court on review shall be paid to all laborers, workers and mechanics performing work under this contract. Certified payroll documentation of general contractor's and all sub-contractors' laborers will be required. The Owner reserves the right to reject any and all bids and bidders and to waive technicalities.

Bid Results

Sidewalks / Parking Lot

$425,000.00

Public - City

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
128
Bidding Soon
2,003
All Active Projects
866
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

June 1, 2022

img_map_placeholder

500 W Elk Grove Blvd, Elk Grove Village, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.