Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Elk Grove Village, Illinois. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Project will include but not limited to: Hot-mix asphalt (HMA) pavement removal, cold in-place pulverizing, HMA surface and binder courses, sidewalk removal and replacement, concrete curb installation, storm sewer improvements, fence removal and installation, tennis color coat, restoration and other items needed to complete the proposed improvements. This project is to be bid as a lump sum contract with supplemental unit prices. Bid security in the form of a Bid Bond or Certified Check for ten percent (10%) of the base bid made payable to the Township High School District 214 shall accompany the bid. The Contractor shall begin the work to be performed under the contract after Wednesday, June 1, 2022. The Contractor shall be substantially complete by Friday, July 29, 2022 and final completion by Friday, August 5, 2022. Freshman orientation is the week of August 8th, teachers return Thursday August 11th and school starts August 15th. Substantial Completion is defined as all improvements except restoration. Final completion is defined as restoration and punch list items. In case of failure to complete the work on time, liquidated damages shall be assessed in accordance with the General Conditions of the Contract for Construction shall apply. All bidders will submit along with their respective bid documents, a resume of similar projects performed, enumerated as to location, type of work, approximate completion date, and project engineering firm. Additionally, all bidders will submit a list of equipment owned by, or available to them, for the efficient pursuance of the project. All bidders will submit along with their respective bid documents, a satisfactory progress schedule or critical path schedule which shall show the proposed sequence of work, and how the Contractor proposes to complete the various items of work on or before the completion date specified. Contractor shall work around the individual summer school schedules provided on the plans and listed in the special provisions. Failure to provide a satisfactory progress schedule in the bid package will, at the discretion of the District, be disqualified. Not less than the prevailing rate of wages as found by the Department of Labor or determined by a court on review shall be paid to all laborers, workers and mechanics performing work under this contract. Certified payroll documentation of general contractor's and all sub-contractors' laborers will be required. The Owner reserves the right to reject any and all bids and bidders and to waive technicalities.
Bid Results
Sidewalks / Parking Lot
$425,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2022
June 1, 2022
500 W Elk Grove Blvd, Elk Grove Village, IL
Related To This Project
Elk Grove Village, IL
Bid Date: Mar 29 2022
Elk Grove Village, IL
Bid Date: May 16 2022
Elk Grove Village, IL
Bid Date: Jun 17 2022
Elk Grove Village, IL
Bid Date: Oct 11 2023
Elk Grove Village, IL
Bid Date: Oct 26 2023
Elk Grove Village, IL
--
Elk Grove Village, IL
Bid Date: Nov 28 2023
Elk Grove Village, IL
Bid Date: Dec 05 2023
Elk Grove Village, IL
Bid Date: Jan 11 2022
Elk Grove Village, IL
Bid Date: Mar 03 2022
Elk Grove Village, IL
--
Elk Grove Village, IL
Bid Date: Feb 15 2022
Elk Grove Village, IL
--
Elk Grove Village, IL
Bid Date: Jan 07 2022
Elk Grove Village, IL
Bid Date: Sep 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.