Site work and paving for a civil project in Missouri City, Texas. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**Bids rejected and project will not be moving forward** The City of Missouri City intends to award to one contractor the complete construction of improvements to intersections along Sienna Parkway as indicated in the plan set. Including, but not limited to, concrete and asphalt road paving, underground utilities, traffic signal modifications and associated grading and landscaping. The successful contractor shall provide all labor, materials and transportation necessary to perform the work under this contract per specifications. Work hours for awarded contractor will be limited to the time between 9am to 3pm seven days a week. This project will be managed by the City of Missouri City Public Works and Traffic Operations Staff. Q & A deadline: May 11, 2022 4:00:00 PM MDT construction will take place in multiple intersection locations along Sienna Parkway starting from Sienna Ranch Road to Sienna Springs Boulevard. The sections to be constructed, from south to north, include the following: 1. Sienna Parkway @ McKeever Road 2. Sienna Parkway @ Sienna Ranch Road 3. Sienna Parkway @ Harvest Market 4. Sienna Parkway @ Watts Plantation 5. Sienna Parkway @ Sienna Springs Boulevard Construction of section 1 will take place at the intersection of Sienna Parkway @ McKeever Road. This section of the project includes adding a left turn southbound into McKeever Road and a dedicated right turn lane northbound into McKeever Road. Roadway improvements will consist of 8" concrete pavement and 8" lime stabilized subgrade. Drainage improvements include regrading ditches. Traffic signal modifications will also occur at the Sienna Ranch intersection. Construction of section 2 will begin at the intersection of Sienna Parkway @ Sienna Circle/Silver Ridge Boulevard and end 300' North of Sienna Ranch Road. This section of the project includes widening Sienna Parkway Southbound and improving the intersection at Sienna Ranch to include an additional left turn lane southbound and providing additional storage for two left turn lanes northbound. Roadway improvements will consist of 8" concrete pavement and 8" lime stabilized subgrade. Drainage improvements include regrading of ditches and extending existing culverts. Traffic signal modifications will also occur at the Sienna Ranch intersection. Construction of Section 3 begins about 500' North of Sienna Ranch Road. This section includes adding a left turn lane at the Harvest Market shopping center. Roadway improvements will consist of 8" concrete pavement and 8" lime stabilized subgrade. Construction of section 4 will begin 430' south of Avalon Plantation Drive and end 200' South of Fort Parkway Toll Road. This section includes Widening southbound within said limits to provide a through lane until Avalon Plantation Drive and a dedicated left turn lane to Watts Plantation Road. The roadway improvements will consist of 8" concrete pavement and 8" lime stabilized subgrade. Traffic signal modifications will also occur at the Watts Plantation intersection. Estimated Budget: The estimated budget for this project is $2,810,947.50

Project Abandoned

Roads / Highways

$4,850,294.00

Public - City

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
316
Active Projects
211
Bidding Soon
4,125
All Active Projects
1,718
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 18, 2022

August 18, 2022

img_map_placeholder

Sienna Pkwy, Missouri City, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.