BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Caldwell, Texas. Completed plans call for site work for a water / sewer project.

QUESTIONS DEADLINE: THURSDAY, MARCH 17, 2022, AT 2:00 P.M. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. 1. Furnish temporary pump as necessary to test pump existing well and ascertain specific capacity (GPM/ft = Drawdown Rate) over total period of 8 hours. Record results every 2 hours and inform/confer with Engineer before acquiring new pump. 2. Coordinate with Owner/BTU to kill and reconnect power as required. 3. Replace existing deteriorated pump control panel w/ new in NEMA 3R enclosure. Square D, Gould, Franklin or approved equal compatible with new pump. Construct suitable stand (re. sketch) for mounting panel, instead ofon pole as is. 4. Install new 4", submersible pump including new 4" drop pipe, electrical cable, etc. Pump shall be properly sized to match capacity ofwell, but for bid purposes, assume 20 HP, capable of 440 GPM at 132' TDH. Pump shall be 3 ph, 230V, Grundfos or approved equal. 5. Fabricate and install removeable steel cap plate to close offtop ofwell casing. Include 2" welded steel nipple w/ threaded cap for access port to check water level. 6. Reconnect discharge piping and appurtenances at well, including changing out one existing air-vac with new pressure reliefvalve (set @ 60 psi). Furnish all labor, materials, and equipment necessary to remove existing well pump, and electrical and replace with 4", 20 HP submersible pump including 4" piping, electrical cable, etc. Pump shall be capable of 440 GPM at 132' TDH.

Post-Bid

Water / Sewer

$70,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
57
Bidding Soon
2,951
All Active Projects
1,089
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2022

April 25, 2022

img_map_placeholder

To Be Determined, Caldwell, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.