BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a fire / police facility in Pevely, Missouri. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

As of June 11 2024 this project is in construction. Professional Design and Construction Phase Services for the Project includes: o Program Space Planning o Architectual o Structural o Civil/Site o Mechanical o Electrical o Plumbing o Security o Telemcommunications. o Construction Engineering o Construction Management Team will be required to perform any necessary utility coordination, environmental permitting, State or Federal agency coordination and interior design of a specialty building facility. Additionally, the team selected will be required to support the project through any municipal planning and zoning requirements, changes or amendments, as well as all applicable Code reviews. Conceptual, preliminary and final construction phase documents and estimates of probable construction shall also be required. Firms submitting qualifications should have a welldocumented history of working with forensic crime labs and understand the physical and technical requirements needed for various lab accreditations. Project also include construction engineering (CE) and construction management (CM) performed by the chosen team. CE/CM services shall include, but not be limited to, responses to request for information by bidder/contractor, shop drawing and material certification reviews, value engineering proposal reviews, material substitution reviews, correction of plan errors, support with change order reviews, construction inspection, material testing, etc. Construction administration (CA) shall be performed by the County or contracted support professional. CA services include design reviews, bid package preparation, stakeholder coordination, payment application and invoicing review/processing, coordinating/planning meeting schedules, quality assurance inspections, etc.

Under Construction

Fire / Police

$9,400,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
52
Bidding Soon
795
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

img_map_placeholder

1177 Mason Cir, Pevely, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.