BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Livermore, California. Contact the soliciting agency for additional information.

The Work consists of, the supply of fully operated and maintained construction equipment and the furnishing of labor and material to implement maintenance and emergency work on an as needed basis for flood control facilities including, but not limited to, 1) removal of sediment; 2) installation of class II aggregate base and asphalt concrete on access roads and driveways; 3) installation of earthen or concrete V-ditches, drainage culverts and structures, drop inlets and pipes, outfall structures and 4) miscellaneous work as directed by the District Representative. The District anticipates that the majority of the Work will be performed during work hours defined in Section 01100 (Summary of Work). However, the Contractor shall be available to perform District's Work on twenty-four hours per day/seven days per week (24/7) basis for emergency Work. When it is determined to be an emergency Work by the District Representative, Contractor must mobilize work force and equipment and respond to sites within two (2) hours of District notification, to perform the Work specified by District. For nonemergency Work, Contractor is required to mobilize and respond to District's request no more than two (2) calendar weeks upon notification. In order to facilitate a quick deployment of equipment and work force in an emergency, the District requires that the BIDDER shall have an operation yard located within a twenty-five (25) mile radius of the Zone 7 North Canyons Parkway office in Livermore. Failure to comply with this condition will result in disqualification of bids. The contract is in the amount not to exceed $1,200,000 per year. However, bid items may be greatly increased or decreased or reduced to zero. The increase or decrease of these amounts as compared with those set forth in the Document 00520 (Agreement) will not constitute a basis for claim by the Contractor for extra payment or damages or for anticipated profit. All work will be measured for payment on a time and material basis at the hourly rates and markup percentages set forth in the Document 00520 (Agreement). The duration of the Contract shall be from July 1, 2022 through June 30, 2025. During this period, the Contractor shall be available to perform Work on an on-call basis as directed by the District Representative. The contract may be extended for Two (2) additional one-year periods solely at the District's discretion. If the District extends the Contract for an additional one year period, the Contract Bonds and Insurance (Item 1), the unit prices from Items 2 through 17 for equipment and labor and Item 22 for in effect at the time of contract extension. The indexing for each additional one-year period, if any, shall occur once on the first day of the extension, and will remain in effect for the remainder of each additional one-year period. The Construction Cost Index for April, 2022 shall be used as the base in comparison for updating the Bid prices for reimbursement purposes for the additional periods, if any. District specifically reserves the right, in its sole discretion, to reject any or all Bids, or re-bid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work.

Post-Bid

Water / Sewer

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
374
Active Projects
187
Bidding Soon
3,557
All Active Projects
1,452
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 5, 2022

July 1, 2022

June 30, 2023

img_map_placeholder

Multiple Locations, Livermore, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.